![Delta FOUL V3 Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/delta/foul-v3/foul-v3_installation-manual_2474788015.webp)
5. Installation of Chamber
5.4 INSTALLATION OF CHAMBER - SECTION D2
Backfill around chamber with concrete
To be followed when installing chamber in the ground.
Completely fill chamber with water.
Fill void between soil and chamber with
concrete (min. C35 grade) or as per
engineer’s drawings.
Allow concrete to cure.
01992 523 523 | [email protected] | www.deltamembranes.com
17
18
19
13