4. Installation and Setup
Lifting and Transport
All lifting and transport must be done using proper handling equipment. The system must
always remain in a vertical upright position and never leaned or turned over on its side.
Unpacking the Crate
Remove the packing cardboard box and the second nylon packing around the centrifuge.
Manufacturer-Provided Items
Items provided with the system are listed below. Please ensure everything is included and
intact.
−
Main Control Panel
−
CUP System
−
Mesh Bags
−
Lid Assembly Fittings
−
Drain Port Assembly Fittings
−
(2) Distillery Hoses and fittings. One long Hose (Fill Hose) and One Short Hose (Drain
Hose)
−
System Parts Components and Packing List
−
System Manual
System Placement
Prior to installing the system:
−
Check that no damage to the system or casters has occurred during transport.
−
Check that the system placement area is level and suitable for positioning. Double-
check that all four casters are on level ground.
−
Leave sufficient space around the system for an unobstructed work area.
−
Verify that the system is placed in a properly ventilated area that has been approved by
your local fire marshal.