7
Installation
Fixation of reaction arm (vertical/ceiling position installation)
●● In case of ceiling installation, fixation point should be as much as possible
straight above the point of torque application (
•
).
●● Check that work field of the arm is free from obstacles.
●● Fix the arm through the pre-drilled holes on wall attachment (
②
)
●● Fix the power tool in the tool holder (
③
)
●● Adjust the balancer tension (
④
as example only).
●● Last, make a functional check over the whole work field.
①
Maintenance
Maintenance must be performed only from qualified personnel.
●● In advance of any intervention: disconnect the tool from power source.
In the next page find maintenance guidelines.
②
④
③
Содержание 020.0002.000
Страница 4: ...4 Arm usable work range 90...
Страница 5: ...5 Arm angular freedom 90...