background image

Installation 

Fixation of reaction arm (vertical/ceiling position installation) 

●● In case of ceiling installation, fixation point should be as much as possible
straight above the point of torque application (

).

●● Check that work field of the arm is free from obstacles.
●● Fix the arm through the pre-drilled holes on wall attachment (

●● Fix the power tool in the tool holder (

)

●● Adjust the balancer tension (

 as example only).

●● Last, make a functional check over the whole work field.

 

Maintenance 

Maintenance must be performed only from qualified personnel. 
●● In advance of any intervention: disconnect the tool from power source.

In the next page find maintenance guidelines. 

 

 

Содержание 020.0002.000

Страница 1: ...User s Manual ERGO Torque arms Warning We recommend reading this manual and included safety instructions in advance of any use or intervention on the product The contents must be clearly understood b...

Страница 2: ...ndatory e g protective gloves General warnings All operations must be carried out either by Delta Regis personnel or by other company authorized by Delta Regis but professionally trained and educated...

Страница 3: ...lb mm in mm in ERGO 15 1000 025 0001 000 15 11 06 531 5 20 93 1111 5 43 76 ERGO 15 1500 025 0002 000 15 11 06 691 5 27 22 1601 5 63 05 ERGO 40 1000 025 0005 000 40 29 50 535 5 21 08 1115 5 43 90 ERGO...

Страница 4: ...4 Arm usable work range 90...

Страница 5: ...5 Arm angular freedom 90...

Страница 6: ...erator considering his preferred hand Fix arm to workstation support through wall attachment with appropriate screws Fix the power tool in the tool holder Always try to install the balancer as much in...

Страница 7: ...eld of the arm is free from obstacles Fix the arm through the pre drilled holes on wall attachment Fix the power tool in the tool holder Adjust the balancer tension as example only Last make a functio...

Страница 8: ...DEN We recommend to regularly rub the tubes surface with a clean and dry cloth in order to avoid dust accumulation which might reduce the sliding performances of tubes Pos Check Intervention timing Cy...

Страница 9: ...854 7179 In case of problems for fining ANSI regulation copies it is possible to contact them directly through the site http www ansi org Additional information about work safety and health can be fou...

Страница 10: ...th electric power sources and are not intended for use in areas with potentially explosive atmospheres Limited warranty 1 This product is product is warranted against defective workmanship or material...

Отзывы: