background image

7

Read this instruction booklet carefully before
installing and using the machine. In this way,
you will obtain the best possible results and
maximum operating safety.

DESCRIPTION OF THE APPLIANCE

The following terms are used throughout the
instructions manual.

1. Cup stand
2. Accessories holder 
3. Steam control knob
4. Water tank
5. Power cord
6. Cup holder grill
7. Drip tray
8. 2-cup adaptor
9. “Cappuccino” nozzle 
10. Steam and hot water nozzle
11. Boiler outlet
12. Measuring spoon
13. Filter thumb guard
14. Filter holder
15. 1-cup filter 
16. 2-cup filter 
17. Pod filter
18. Automatic coffee press
19. Steam switch
20. Coffee dispenser switch
21. ON/OFF switch  (       )
22. ON/OFF indicator light (       )
23. “OK” indicator light
24. Steam indicator light
25. Coffee press
26. Pressure gauge (if fitted)

INSTALLATION

• Place the appliance on a flat work surface away

from water sources such as taps or sinks.

• Check that the voltage of the electrical power

line corresponds to the voltage indicated on the
appliance label.  Connect the appliance only to
a power source having a minimum load
capacity of 10 amps and having a proper
grounding feature.  The manufacturer takes no
responsibility for any accidents caused by the
lack of a grounding device for the appliance.

• In case of incompatibility between the plug and

your socket, have the socket replaced by a
qualified electrician. The supply cable must not
be replaced by the user, as this requires the use
of special tools. If the supply cable is damaged,
contact an authorized Service Centre.

• Never install the machine in an environment

which can reach a temperature of less than or
equal to 0°C (if the water inside the machine
freezes, the machine might be damaged):

FILLING THE TANK

Remove the reservoir by pullling it sideways, at the
same time lifting the tubes (fig. 1).
Rinse the reservoir and fill with fresh water (fig. 2).
Replace the reservoir in its housing, ensuring that
the tubes are immersed in the water (fig. 3). A
simpler way of filling the reservoir is to pull it out
just enough to be able to pour in water directly
from a jug. Never start up the appliance without
water in the tank.

PRE-HEATING OF THE MACHINE

In order to obtain a coffee at the right temperature, it is
necessary to pre-heat the machine by keeping it on by
pushing the ON/OFF switch (fig.4), for at least a half-hour
before making coffee. During this time, 

it is necessary to

leave the filter holder attached to the boiler. 

To attach the filter holder, position it under the 
boiler shower with the handle towards the left - see
fig. 5; push upwards and at the same time rotate
the handle towards the right; always rotate as far
as it will go).
After a half-hour the coffee can then be made as
described below.

To speed up this operation, it is also possible:
1  To turn the machine on by pushing the

ON/OFF switch (fig.4).

2.  To insert the filter holder in the boiler without

coffee or coffee pod. Place a coffee cup
beneath the filter holder.

3.  To wait until the light  "OK" turns on (fig. 6) and

press the delivery switch (fig.7), letting the
water exit until the “OK” light goes off; then
stop the dispensing by pressing the coffee
dispenser switch.

4.  Then empty the water from the cup, wait until

the “OK” light turns back on and repeat the
same operation again.

bar290 GB  25-10-2000 10:52  Pagina 7

Отзывы: