-
14
-
4.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
1) Working table
2) Philips-head screwdriver
3) Glove
4) Cleaning cloth
5) ESD protection
Item
Picture
Operation
Tools
Notes
1
1. Assemble SPS BD wire to SPS
BD
2. Insert AC wire to SPS BD and
assemble SPS BD to Main SHD
2
1. Insert “FFC EDP cable” to I/F BD
and paste 1 tape to fix it.
2. Insert “Wire EDP” to I/F BD and
paste 1 tape to fix it
3. Insert “I/F BD to TBT BD FFC
Cable”, “LED Driver BD Wire”
and “I/F BD to MCU BD wire” to
I/F BD
Содержание UP2720QB
Страница 1: ...Simplified Service Manual UP2720QB Version 01 Date 2021 03 04 ...
Страница 13: ... 13 11 1 Disassemble SPS BD from Main SHD and unplug AC wire from SPS BD 2 Unplug SPS BD wire from SPS BD ...
Страница 19: ... 19 5 Trouble shooting instructions ...
Страница 20: ... 20 ...
Страница 21: ... 21 ...
Страница 22: ... 22 ...
Страница 23: ... 23 ...
Страница 24: ... 24 ...
Страница 25: ... 25 ...
Страница 26: ... 26 ...
Страница 27: ... 27 ...
Страница 28: ... 28 ...