
-
9
-
3. Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
7) Working table
8) Screw-driver
9) Glove
10) Cleaning cloth
ESD protection
Item
Picture
Operation
Tools
Notes
1
1.
Insert “LVDS FFC cable”
and “WIRE 6P/10P” into
I/F BD
2.
Assemble SPS BD to
Main SHD
3.
Insert SPS BD wire to I/F
BD and assemble I/F BD
to Main SHD
4.
Lock 8 PCBA screws
Screw-
driver
(Torsion of
screw:
8.5±1.0kg)
2
1. Assemble Mylar to SPS
BD