1-4
Dell PowerEdge 2400 Systems — Installing Redundant Power Supplies
!
9.
Attach the 12-conductor cable labeled "PWR3" to connector P3 on the PSDB (see
Figure 1-4) and to connector POWER2 on the system board.
PSDB
Power supplies (2)
Catch on power supply handle