1-14
Ra c k I n s t a l l a t i o n G u i d e
www
.dell.com | support.dell.com
7
Route the status-indicator end of the cable assembly through the cable-management
arm, and install the indicator in its slot at the back end of the cable-management arm
(see Figure 1-9).
8
Connect the power cords to their receptacles on the back panel.
NOTICE:
Although the strain-relief can accommodate power cords with a bend radius
of up to 19 mm (0.75 inch), the system manufacturer recommends that you only use
the power cords provided with the system.
9
Install a tie-wrap through the slot on the strain-relief tab (see Figure 1-10).
10
Bend the power cords back beside the power receptacle housing, forming a tight loop,
and install the strain-relief tie-wrap loosely around the looped power cords (see
Figure 1-10).
F i g u r e 1 - 1 0 .
I n s t a l l i n g t h e P o w e r C o r d S t r a i n R e l i e f
Routing Cables
1
Attach the I/O cable connectors to their respective connectors on the system back.
For details on cable connections, see your system’s
Installation and Troubleshooting
Guide
and the
User’s Guide
.
power cord strain-relief tab and tie wrap
power cord plug
power receptacle housing
5X860eb0.fm Page 14 Monday, October 21, 2002 11:49 AM
Содержание PowerEdge 1650
Страница 105: ...w w w d e l l c o m s u p p o r t d e l l c o m Dell システム ラック取り付けガイド 5X860jt0 fm Page 1 Monday October 21 2002 5 03 PM ...
Страница 136: ...4 28 ラック取り付けガイド w w w d e l l c o m s u p p o r t d e l l c o m 5X860jb0 fm Page 28 Tuesday October 22 2002 3 54 PM ...
Страница 177: ...5X860am0 fm Page 1 Monday October 21 2002 12 15 PM ...