Dell PowerVault 130T Storage System Rack Kit Installation Guide
1-7
Installing the Cage Nuts in the Rack
The cage nuts are installed on both vertical-rail mounting holes located at 4.3 and
13 inches above the bottom of the adjustable rail (see Figure 1-5). Use the following
procedure to install the cage nuts in the rack.
Figure 1-5. Locations for the Cage Nuts
1.
Insert the lower lip of the cage nut over the bottom of the opening in the back of
a rail as shown in Figure 1-6. Insert the small end of the cage-nut tool through the
opening in the rail (from the front) and hook the tool over the top lip of the cage
nut.
13 inches
4.3 inches
Содержание POWER VAULT 130T LIBRARY 130T
Страница 1: ...www dell com Dell PowerVault 130T Storage System Rack Kit INSTALLATION GUIDE ...
Страница 14: ...1 12 Dell PowerVault 130T Storage System Rack Kit Installation Guide ...
Страница 15: ...www dell com Kit de rack du système de stockage Dell PowerVault 130T GUIDE D INSTALLATION ...
Страница 29: ...www dell com Dell PowerVault 130T Speichersystem und Rack Einbausatz INSTALLATIONS LEITFADEN ...
Страница 43: ...www dell com Kit del estante para el sistema de almacenamiento Dell PowerVault 130T GUÍA DE INSTALACIÓN ...