-
15
-
5.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, materials as bellow
:
1) Working table
2) Philips-head screwdriver
3) Hex-head screwdriver
4) Gloves
5) Cleaning cloth
6) ESD protection
Item
Picture
Operation
Tools
Notes
1
1.
Assemble SPS BD into Main
SHD
2.
Insert FFC LVDS into I/F BD
3.
Insert SPS BD to I/F BD wire
into I/F BD.
4.
Assemble I/F BD into Main
SHD
5.
Lock 5 PCBA screws
6.
Lock 4 hexagonal screws.
1. Philips-head
screwdriver
Torsion of PCB
screw:
8.5±1kgf
2. Hex-head
screwdriver
Torsion of hex
screw:
5.0±0.6Kg
2
1. Assemble Mylar (Paste Mylar
on Main SHD like the picture
showed)
Содержание P2423B
Страница 1: ... 1 Service Manual P2423B Version 01 Date 2021 10 27 ...
Страница 8: ... 8 3 Wiring connectivity diagram Wire 1 FFC 1 FFC 2 FFC 3 ...
Страница 19: ... 19 6 Trouble shooting instructions ...
Страница 20: ... 20 ...
Страница 21: ... 21 ...
Страница 22: ... 22 ...
Страница 23: ... 23 ...
Страница 24: ... 24 ...
Страница 25: ... 25 ...