3 Power Connections
After installing the appliance in a rack, connect it to power and make sure it is operational.
Connecting an Appliance to Power
1. Remove the power cables from the shipping box.
2. Plug the power cables into the appliance power supplies. Wrap the hook-and-loop strain relief around the
power cable, as shown in
.
3. Connect the appliance to a power source.
Figure 7: Secure the Power Cable with the Strain Relief
The appliance turns on as soon as the power supplies are connected to a live power source.
Each controller contains a backup power supply (BPS). The BPS batteries begin to charge when the
appliance is connected to power. A full charge takes up to eight hours to complete; the NAS appliance
is not fully redundant until the battery is fully charged. The BPS provides the clustered solution enough
time to write all cached data to disk if the controller experiences a loss of power.
4. Check the LED on the front panel to make sure the appliance is operational (see
).
15
Содержание EqualLogic FS7610
Страница 1: ...Dell EqualLogic FS7610 Series Appliances Installation and Setup Guide Regulatory Model Series E02T ...
Страница 4: ...iv Dell EqualLogic Installation and Setup Guide ...
Страница 5: ......
Страница 8: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 15: ......
Страница 16: ......
Страница 20: ...14 Dell EqualLogic FS7610 Installation and Setup Guide 2 Hardware Rack Mounting ...
Страница 22: ...16 Dell EqualLogic FS7610 Installation and Setup Guide 3 Power Connections ...
Страница 24: ......
Страница 26: ......
Страница 27: ......
Страница 32: ......
Страница 34: ...28 Dell EqualLogic FS7610 Installation and Setup Guide 5 NAS Cluster Configuration ...
Страница 42: ...Glossary 36 ...
Страница 46: ...Index rack mount Unicode support 40 ...