Figure 85. Installing the VGA module
Next steps
1. Route the VGA cable and connect it to the VGA connector on the system board. For locating the connector, see the
section.
2.
3.
.
4.
.
5. Follow the procedure listed in
After working inside your system
.
.
Power supply unit
NOTE:
While replacing the hot swappable PSU, after next server boot; the new PSU automatically updates to the same
firmware and configuration of the replaced one. For more information about the Part replacement configuration, see the
Lifecycle Controller User's Guide
at
https://www.dell.com/idracmanuals
Hot spare feature
Your system supports the hot spare feature that significantly reduces the power overhead associated with power supply unit
(PSU) redundancy.
When the hot spare feature is enabled, one of the redundant PSUs is switched to the sleep state. The active PSU supports 100
percent of the system load, thus operating at higher efficiency. The PSU in the sleep state monitors output voltage of the active
PSU. If the output voltage of the active PSU drops, the PSU in the sleep state returns to an active output state.
If having both PSUs active is more efficient than having one PSU in the sleep state, the active PSU can also activate the
sleeping PSU.
The default PSU settings are as follows:
●
If the load on the active PSU is more than 50 percent of PSU rated power wattage, then the redundant PSU is switched to
the active state.
●
If the load on the active PSU falls below 20 percent of PSU rated power wattage, then the redundant PSU is switched to
the sleep state.
80
Installing and removing system components
Содержание EMC XC Core XC450
Страница 1: ...Dell EMC XC Core XC450 Installation and Service Manual September 2021 ...
Страница 13: ...Figure 11 Memory information Dell EMC XC Core XC450 system overview 13 ...
Страница 14: ...Figure 12 Service information electrical overview 14 Dell EMC XC Core XC450 system overview ...
Страница 15: ...Figure 13 Service information mechanical overview Dell EMC XC Core XC450 system overview 15 ...