Check
List
Task
Topic
☐
12
Slide the system into the cabinet.
Slide the system into the cabinet
on
page 165.
☐
13
Connect the I/O cables and power
cords.
Connect the I/O cables and power
on page 164.
☐
14
Install the bezel.
Perform mandatory software tasks to return the node to operation:
☐
15
Verify the new BOSS card in the server.
See "Replacing a BOSS card" in the
VxFlex Ready Node Field Replacement Unit
Software Guide
. Perform the relevant
tasks, starting with "Verify the new
BOSS card in the server," according to
the server's operating system type.
☐
16
Return the node to operation.
Prepare the replacement BOSS card
The replacement BOSS card includes two M.2 modules. You must remove these two
modules so you can later migrate the M.2 modules on the faulted BOSS card to the
replacement BOSS card.
Before you begin
Follow all safety guidelines.
Procedure
1. Unpack the replacement BOSS card.
2. Unfasten the screw that secures the M.2 module on the BOSS card.
3. Lift the M.2 module away from the BOSS card.
Note
The M.2 modules will be installed on the faulted BOSS card at completion of the
replacement procedure.
Hardware FRU procedures
Prepare the replacement BOSS card
59
Содержание EMC VxFlex Ready Node R840
Страница 10: ...TABLES 10 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...
Страница 12: ...Notes cautions and warnings 12 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...
Страница 218: ...Getting help 218 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...