Check
List
Task
Topic
☐
13
Connect the I/O cables and power cords. See
Connect the I/O cables and power
on page 164.
☐
14
Install the bezel.
See
on page 166.
Perform mandatory software tasks to return the node to operation:
☐
15
Configure the M2 module as a RAID
device.
See "M.2 SSD module replacement
procedural checklist" in the VxFlex Ready
Node Field Replacement Unit Software
Guide
. Perform the relevant tasks,
starting with "Rebuild the M.2 cards as a
RAID device."
☐
16
Return the node to operation.
Remove the M.2 SSD module
Before you begin
Follow all safety guidelines.
Procedure
1. Loosen the screw and lift the retention strap that secures the M.2 SSD module
on the BOSS card.
2. Lift the M.2 SSD module and slide it out of the connector on the BOSS card.
Figure 50 Removing the M.2 SSD module
Install the M.2 SSD module
Before you begin
Follow all safety guidelines.
Hardware FRU procedures
Remove the M.2 SSD module
117
Содержание EMC VxFlex Ready Node R840
Страница 10: ...TABLES 10 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...
Страница 12: ...Notes cautions and warnings 12 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...
Страница 218: ...Getting help 218 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...