Guidelines for installing and connecting management
network cables
Use the following illustration as reference for console and management ports on the
switches.
Figure 20 Console and management ports on switches
Note
As cables are installed and connected, dress and tie cables frequently so that excess
slack does not interfere with routing of adjacent cables.
Refer to the management network cable diagrams applicable to your installation:
l
Management network A, nodes 1 - 16
Management network A, nodes 1 - 16 cabling
on page 51
l
Management network B, nodes 17 - 22
Management network A, nodes 17 - 22
l
Management network B, nodes 23 - 32
Management network B, nodes 23 - 32
Install Management Network I/O Cables
50
Hardware Installation Guide
Содержание EMC ScaleIO Ready Node 14G
Страница 1: ...EMC ScaleIO Ready Node 14G Hardware Installation Guide 302 004 321 REV 01 ...
Страница 6: ...FIGURES 6 Hardware Installation Guide ...
Страница 8: ...TABLES 8 Hardware Installation Guide ...
Страница 16: ...Before You Begin 16 Hardware Installation Guide ...
Страница 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Страница 39: ...Figure 17 CMA bracket slots 1U1N Configuration Equipment Installation Connect and route cords and cables 39 ...
Страница 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Страница 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Страница 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Страница 73: ...Figure 34 CMA bracket slots 2U1N Configuration Equipment Installation Connect and route cords and cables 73 ...
Страница 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...