background image

Rack mounting

When you prepare your equipment rack, ensure that the rack is grounded. Ground the equipment rack to the same ground point
the power service in your area uses. The ground path must be permanent.

Switch ground

Dell EMC recommends grounding your switch. Use the S4200-ON Series switch in a CBN.

Fans and airflow

Fan installation is done as part of the factory install based on stock keeping unit (SKU) type. The S4200-ON Series has SKUs
that support the following configurations:

AC PSU with fan airflow from the I/O to the PSU—normal

AC PSU with fan airflow from the PSU to the I/O—reverse

DC fan unit with airflow from the I/O to the PSU—normal

DC fan unit with fan airflow from the PSU to the I/O—reverse

Be sure to order the fans suitable to support your site’s ventilation. Use a single type of airflow fan in your switch. Do not mix
reverse and normal airflows in a single switch.

For proper ventilation, position the switch in an equipment rack or cabinet with a minimum of 5 inches (12.7 cm) of clearance
around the exhaust vents. The fan speed varies based on internal temperature monitoring. The switch never intentionally turns
off the fans.

Power

To connect the switch to the applicable power source, use the appropriate power cable. An AC power cable is included with the
switch.

When installing AC or DC switches, follow the requirements of the National Electrical Code ANSI/NFPA 70, where applicable.

The switch is powered-up when the power cable is connected between the switch and the power source.

CAUTION:

 Always disconnect the power cable before you service the power supply slots. The switch has

multiple power cords. Before servicing, ensure all power cords are disconnected.

CAUTION:

 On the AC switch, use the power supply cable as the main disconnect device. Ensure that the

socket-outlet is located/installed near the equipment and is easily accessible.

NOTE:

 Module power is software controlled. You do not see module LEDs when the switch powers up in ONIE.

Storing components

If you do not install your S4200-ON Series switch and components immediately, properly store the switch and all optional
components following these guidelines:

Storage location temperature must remain constant. The storage range is from -40°C to 70°C (-40°F to 158°F).

Store on a dry surface or floor, away from direct sunlight, heat, and air conditioning ducts.

Store in a dust-free environment.

NOTE:

 ESD damage can occur when components are mishandled. Always wear an ESD-preventive wrist or heel ground

strap when handling the switch and its accessories. After you remove the original packaging, place the S4200-ON Series
switch and its components on an anti-static surface.

Site preparations

7

Содержание EMC PowerSwitch S4200-ON Series

Страница 1: ...Dell EMC PowerSwitch S4200 ON Series Set up Guide March 2021 Rev A01 ...

Страница 2: ...l damage to hardware or loss of data and tells you how to avoid the problem WARNING A WARNING indicates a potential for property damage personal injury or death Copyright 2017 Dell Inc or its subsidiaries All rights reserved Dell EMC and other trademarks are trademarks of Dell Inc or its subsidiaries Other trademarks may be trademarks of their respective owners ...

Страница 3: ...tion 8 Unpack 8 Rack or cabinet installation 9 ReadyRails installation 9 1U Tool less mount installation 10 Two post flush mount installation 11 Two post center mount installation 12 Four post threaded installation 13 S4200 ON Series switch installation 14 1U front rack installation 14 Optics installation 16 Switch power up 16 After switch installation 16 Chapter 4 Specifications 17 Chassis physic...

Страница 4: ...e emitted from the aperture of the optical transceiver ports Avoid exposure to laser radiation and do not stare into open apertures Topics Related documents Information Symbols Related documents For more information about the S4200 ON Series S4248FB ON and S4248FBL ON see the following documents OS10 Enterprise Edition Release Notes OS10 Enterprise Edition User Guide S4200 ON Series Installation G...

Страница 5: ...NOTE The ESD Warning icon requires that you take electrostatic precautions when handling the device About this guide 5 ...

Страница 6: ...o your local electrical codes Environmental switch location continuous temperature range is from 0 C to 45 C 32 F to 113 F Operating humidity is from 5 to 85 percent noncondensing continuous In a dry clean well ventilated and temperature controlled room away from heat sources such as hot cooling vents or direct sunlight Away from sources of severe electromagnetic noise Positioned in a rack or cabi...

Страница 7: ...er cable An AC power cable is included with the switch When installing AC or DC switches follow the requirements of the National Electrical Code ANSI NFPA 70 where applicable The switch is powered up when the power cable is connected between the switch and the power source CAUTION Always disconnect the power cable before you service the power supply slots The switch has multiple power cords Before...

Страница 8: ...lation S4200 ON Series switch installation 1U front rack installation Optics installation Switch power up After switch installation Unpack NOTE Before unpacking the switch inspect the container and immediately report any evidence of damage When unpacking the S4200 ON Series switch make sure that the following items are included One S4200 ON Series S4248FB ON or S4248FBL ON switch One RJ 45 to DB 9...

Страница 9: ...component power ratings do not exceed the circuit capabilities Overloaded power sources and extension cords present fire and shock hazards Elevated ambient temperature If you install the switch in a closed rack assembly the operating temperature of the rack environment may be greater than the room ambient temperature Use care not to exceed the 45 C maximum ambient temperature of the switch Reduced...

Страница 10: ...hed to the rail assembly 1 Face the ReadyRails flange ears facing outward Place one rail between the left and right vertical posts Align and seat the back flange rail pegs in the back vertical post flange The center extractions show how the pegs appear in both the square and nonthreaded round holes 10 S4200 ON Series Installation ...

Страница 11: ... rail Two post flush mount installation NOTE For more installation instructions see the installation labels attached to the rail assembly 1 For this configuration remove the latch castings from the front side of each ReadyRails assembly item 1 To remove the two screws from each front flange ear on the switch side of the rail and remove each latch casting use a Torx screwdriver Retain the latch cas...

Страница 12: ...t to the post flange with two user supplied screws item 3 4 Repeat this procedure for the second rail Two post center mount installation NOTE For more installation instructions see the installation labels attached to the rail assembly 1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user supplied screws item 1 12 S4200 ON Seri...

Страница 13: ...ocedure for the second rail Four post threaded installation NOTE For more installation instructions see the installation labels attached to the rail assembly 1 Remove the latch castings from each end of the ReadyRails assemblies To remove the two screws each latch casting use a Torx driver Retain the latch castings for future rack requirements S4200 ON Series Installation 13 ...

Страница 14: ...s the four post configurations 1U front rack installation Configure the rails that are attached to the switch 1 NOTE For more information see the installation instruction labels on the rail Attach the inner switch rails to the S4200 ON Series switch Line up the rail with the mounting heads and attach the rail to the chassis Slide the rail back until it locks into place The following shows the deta...

Страница 15: ...eadyRails Slide the switch in until it is flush with the front of rack About three inches before you fully insert your switch the rail locking feature engages to keep the switch from inadvertently sliding out and falling Figure 8 Front rack installation S4200 ON Series Installation 15 ...

Страница 16: ...erature around the unit which may be higher than the room temperature is within the limits specified for the S4200 ON Series see Specifications There is sufficient airflow around the unit The input circuits are correctly sized for the loads and that you use sufficient overcurrent protection devices All protective covers are in place Blank panels are installed if you do not install optional modules...

Страница 17: ... 1 72 inches 44 mm Width 17 1 inches 434 mm Depth 18 2 inches 462 mm PSU fan tray handle 1 57 inches 40 mm Chassis weight with factory installed components 22 lbs 2 PSUs 9 98 kg 2 PSUs Rack clearance required Front 5 inches 12 7 cm Back 5 inches 12 7 cm Table 2 Environmental parameters Parameter Specifications Operating temperature 0 C to 45 C 32 F to 113 F continuously 5 C to 45 C 23 F to 113 F s...

Страница 18: ...ble 3 AC power requirements Parameter Specifications Power supply 100 240 VAC 50 60 Hz Maximum current draw per system 6A 5A at 100 120V AC 3A 2 5A at 200 240V AC Maximum power consumption 600 Watts Typical power consumption 300 Watts Table 4 DC power requirements Parameter Specifications Minimum and maximum input voltage range 40 5 60V DC 15A Max Maximum power consumption 600 Watts Start up VDC 3...

Страница 19: ...e bottom of the web page and select your country from the drop down menu To obtain product specific information enter the 7 character service tag known as a luggage tag or 11 digit express service code of your switch and click Submit To view the chassis service tag or express service code pull out the tag or enter the show chassis command from the CLI To receive more technical support click Contac...

Отзывы: