Table 11. Configuration 3: R1b (continued)
Card type
Slot priority
Maximum number of cards
Dell BOSS M.2 Module
Integrated slot
1
Table 12. Configuration 4: R1b+R2b
Card type
Slot priority
Maximum number of cards
Broadcom (NIC: 25G)
2
2
Broadcom (NIC: 10G)
2
2
Intel (NIC: 10G)
2
2
Broadcom (NIC: 25G)
2
2
Intel (NIC: 1G)
2
2
Mellanox (NIC: 100Gb)
1
2
Intel (NIC: 25Gb)
2
2
Mellanox (NIC: 25Gb)
2
2
SolarFlare (NIC: 25Gb)
2
2
Mellanox (NIC: HDR100 VPI)
2
2
Mellanox (NIC: HDR VPI)
2
2
Intel (OCP: 100Gb)
Integrated slot
1
Broadcom (OCP: 25Gb)
Integrated slot
1
Intel (OCP: 25Gb)
Integrated slot
1
Marvell (OCP: 25Gb)
Integrated slot
1
Mellanox (OCP: 25Gb)
Integrated slot
1
QLogic (OCP: 25Gb)
Integrated slot
1
Broadcom (OCP: 10Gb)
Integrated slot
1
QLogic (OCP: 10Gb)
Integrated slot
1
Intel (OCP: 10Gb)
Integrated slot
1
Broadcom (OCP: 1Gb)
Integrated slot
1
Intel (OCP: 1Gb)
Integrated slot
1
Dell BOSS M.2 Module
Integrated slot
1
Intel (PCIe SSD AIC)
2
1
Samsung (PCIe SSD AIC)
2
1
Nvidia (GPU: T4 16 GB)
2
1
Removing the expansion card riser 1
Prerequisites
NOTE:
Install an expansion card filler bracket over an empty expansion slot to maintain Federal Communications
Commission (FCC) certification of the system. The brackets also keep dust and dirt out of the system and aid in proper
cooling and airflow inside the system.
1. Follow the safety guidelines listed in
.
2. Follow the procedure listed in
Before working inside your system
3.
.
36
Installing and removing system components