Figure 5. Open top panel
4. Replace the long, narrow thermal pad, as shown in the following figure.
Figure 6. Thermal pad replacement
5. Disconnect cables from the inside of the top panel. This includes disconnecting the switch cable and power cable from their
wire mounts, and disconnecting the switch cable and power cable connectors.
8
Installation procedure for 4G and 5G LTE modules
Содержание EMC Edge Gateway 3200
Страница 34: ...Figure 48 Rear panel screw locations 34 Installation procedure for 2x RS 422 485 uFM module ...
Страница 75: ...Figure 127 Rear panel screw locations Installation procedure for 2x GbE LAN 75 ...
Страница 102: ...Figure 175 Rear panel screw locations 102 Installation procedure for 8x DI O uFM module ...