![Dell Active Fabric Manager Скачать руководство пользователя страница 53](http://html.mh-extra.com/html/dell/active-fabric-manager/active-fabric-manager_deployment-manual_85057053.webp)
Pre-Deployment Configuration
To prepare the fabric for deployment, use the Pre-deployment Configuration Wizard. After you initiate the pre-
deployment configuration, you can only update the fabric description and port count for expanding uplinks and
downlinks.
Prerequisites
Before you begin:
1. Rack the equipment in the fabric.
NOTE: Before racking the switches, make sure that you have the csv. file that contains the system MAC
addresses for each switch in the fabric. If you do not have this file, record the system addresses before you
rack the switches.
2. Power off the switches in the fabric.
Gather the useful information listed in
Gathering Useful Information for a Layer 3 Distributed Core Fabric
or
Gather
Useful Information for a Layer 2 VLT Fabric
.
Use the following pre-deployment flowchart as a guide to prepare the fabric for deployment.
53
Содержание Active Fabric Manager
Страница 1: ...Active Fabric Manager Deployment Guide 1 5 ...
Страница 8: ...8 ...
Страница 10: ...10 ...
Страница 14: ...Figure 2 Designing and Deploying a Fabric Flowchart 14 ...
Страница 48: ...48 ...
Страница 86: ...86 ...
Страница 118: ...118 ...