3.
Place the library at the front of the rack on the support angles of the rails and push it into the rack to
the back stop.
4.
If you are installing multiple modules, verify that this module is installed directly above or below its
adjacent module and is contained within the correct 3U volume. Remove the tape that is covering the
alignment pin lock/unlock lever on the rear of each module. The gap between modules must be less
than 4 mm.
Figure 41. Side rails installed
Figure 42. Sliding the library into the rack
Installing
45
Содержание 3555-E3A
Страница 1: ...Dell EMC ML3 Tape Library User s Guide ...
Страница 2: ......
Страница 4: ...iv Dell EMC ML3 Tape Library User s Guide ...
Страница 8: ...viii Dell EMC ML3 Tape Library User s Guide ...
Страница 10: ...x Dell EMC ML3 Tape Library User s Guide ...
Страница 20: ...xx Dell EMC ML3 Tape Library User s Guide ...
Страница 22: ...xxii Dell EMC ML3 Tape Library User s Guide ...
Страница 44: ...22 Dell EMC ML3 Tape Library User s Guide ...
Страница 54: ...32 Dell EMC ML3 Tape Library User s Guide ...
Страница 94: ...72 Dell EMC ML3 Tape Library User s Guide ...
Страница 126: ...104 Dell EMC ML3 Tape Library User s Guide ...
Страница 153: ...Figure 81 Unlocked spooling mechanism enlarged view Upgrading and servicing 131 ...
Страница 164: ...142 Dell EMC ML3 Tape Library User s Guide ...
Страница 174: ...152 Dell EMC ML3 Tape Library User s Guide ...
Страница 176: ...154 Dell EMC ML3 Tape Library User s Guide ...
Страница 195: ...XRA External register address register Glossary 173 ...
Страница 196: ...174 Dell EMC ML3 Tape Library User s Guide ...
Страница 200: ...178 Dell EMC ML3 Tape Library User s Guide ...
Страница 201: ......
Страница 202: ...Printed in USA ...