background image

Figure 5. Attaching lower trim strip

Ground the cabinet

Equipment correctly installed within the cabinet is grounded through the AC power cables and connectors. In general, supplemental
grounding is not required.

About this task

If your site requires external grounding (for example, to a common grounding network beneath the site floor), you can use the grounding
lugs provided on each of the cabinet’s lower power distribution panels (PDP).

A

A

A

A

A

A

A  

A

A

A

A

A

A

A

A  

A

CL5003

046-003-350

A

A

A

A

A

A

A  

A

A

A

A

A

A

A

A  

A

046

-003

-350

Ground lug

A

A

A

A

A

A

A  

A

A

A

A

A

A

A

A  

A

13

Содержание 40U-P

Страница 1: ...ware acclimation 2 Steps to unpack and setup cabinet 3 Remove the ramp and shipping material from the cabinet 3 Remove the cabinet shipping brackets 5 Attach the unloading ramp 6 Roll the cabinet down the ramp 7 Position and level the cabinet 8 Power requirements 8 Attach optional brackets 11 Install the lower trim strip 12 Ground the cabinet 13 Repackaging shipping material 2 piece ramp kits only...

Страница 2: ...only CL5427 NOTE The illustrations in this guide are examples only Depending on what you ordered your configuration may look somewhat different from what is shown here Tools required 9 16 in 14 mm socket wrench Adjustable wrench Flat screwdriver Phillips screwdriver Hardware acclimation Systems and components must acclimate to the operating environment before power is applied to them Once unpackag...

Страница 3: ...d the shipping and storage temperature gradient of 45 F hr 25 C hr To facilitate environmental stabilization open both front and rear cabinet doors Steps to unpack and setup cabinet The steps to unpack setup and repackage the shipping material are listed in the following table Step Task 1 Remove the ramp and shipping material from the cabinet on page 3 2 Remove the cabinet shipping brackets on pag...

Страница 4: ...CL4691 2 Do not pull a ramp down from the top To release the ramp from the pallet grasp the ramp pull it straight back toward you then pull it straight up to free it from the screws 4 ...

Страница 5: ...moving the bolts that go through the bracket to the cabinet and into the pallet 2 At the front of the cabinet remove the bottom cabinet bezel if necessary Pull the bezel straight out to remove it 3 Remove the bolts that attach the cabinet to the front shipping bracket Your can leave the front bracket attached to the shipping pallet NOTE Save the bolts You may need them later to install optional st...

Страница 6: ...ttach the unloading ramp Steps 1 Insert the ramp brackets into the pallet notches in the rear of the pallet 2 If your shipment includes a two piece ramp attach part A to the pallet and part B to part A 6 ...

Страница 7: ... the feet counter clockwise This raises them to the UP position EMC2845 Leveling Feet Rear Rails WARNING The cabinet is heavy Make certain you have sufficient help and secure footing before rolling the cabinet onto the ramp ATTENTION L armoire est lourde Assurez vous d obtenir l aide d une personne et d avoir un point d appui sûr avant d installer l armoire sur la rampe ACHTUNG Das Gestell ist sch...

Страница 8: ...Power requirements Depending on the cabinet configuration and input ac power source single or three phase the cabinet requires two to 12 independent power sources To determine your site requirements use the published technical specifications and device rating labels This will help provide the current draw of the devices in each rack The total current draw for each rack can then be calculated For D...

Страница 9: ...urce interface receptacle Site NEMA L6 30P NEMA L6 30R North America and Japan Russellstoll 3750DP Russellstoll 9C33U0 North America and Japan IEC 309 332P6 IEC 309 332C6 International CLIPSAL 56PA332 CLIPSAL 56CSC332 Australia Table 3 Three phase AC power connection requirements Specification North American Delta 4 wire connection 3 L and 1 G a International and Australian Wye 5 wire connection 3...

Страница 10: ...or the Delta and Wye three phase PDUs are listed in and a L line phase N neutral G ground Table 4 Three phase Delta type AC power input connector options Three phase Delta rack connector options Customer AC source interface receptacle Site Russellstoll 9P54U2 Russellstoll 9C54U2 North America and International Hubbell CS 8365C Hubbell CS 8364C North America Table 5 Three phase Wye type AC power in...

Страница 11: ... the cabinet is in its final location before attaching the brackets then use the supplied bolts and mounting holes to attach them to the cabinet and floor About this task CL4830 3 3 Figure 1 Anti tip bracket installed on the front of cabinet CL4832 3 3 Figure 2 Anti move bracket installed on the front and back of cabinet 11 ...

Страница 12: ...pped with a front door there is no need to install the lower front bezel trim strip Steps 1 Wipe down the lower cabinet with alcohol wipes 2 On the underside of the lower trim strip remove the double sided tape from the velcro fasteners Figure 4 Placement of velcro fasteners on lower trim strip 3 Align the lower trim strip with the lower cabinet and firmly press the bezel onto the cabinet until it...

Страница 13: ...nding is not required About this task If your site requires external grounding for example to a common grounding network beneath the site floor you can use the grounding lugs provided on each of the cabinet s lower power distribution panels PDP A A A A A A A A A A A A A A A A CL5003 046 0 03 35 0 A A A A A A A A A A A A A A A A 046 00 3 3 50 Ground lug A A A A A A A A A A A A A A A A 13 ...

Страница 14: ...ngthwise before collapsing the three sections as shown 3 CL4690 1 2 2 Stack the shipping brackets on the pallet as shown CL4697 3 2 1 3 Place ramp section B upside down on the pallet then stack section A right side up 4 Stack the two folded outer sleeves above the ramp sections 5 Apply the two collar sections to either side of the pallet hold them in place with the package hood 14 ...

Страница 15: ...as unpacked after delivery refer to the contact number attached to the pamphlet for repacking This contact is the carrier network for the initial shipment and they will follow the same process as for the initial shipments If you need help For questions about technical support and service contact you service provider For questions about upgrades contact your sales office More information about this...

Страница 16: ...tial damage to hardware or loss of data and tells you how to avoid the problem WARNING A WARNING indicates a potential for property damage personal injury or death 2018 2020 Dell Inc or its subsidiaries All rights reserved Dell EMC and other trademarks are trademarks of Dell Inc or its subsidiaries Other trademarks may be trademarks of their respective owners ...

Отзывы: