![Deka Unigy II Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/deka/unigy-ii/unigy-ii_installation-and-operation-manual_2465433013.webp)
13
Fig. A-1
Fig. A-2
APPENDIX A
Relay Rack Assembly
1. Attach the floor mounting brackets to the frame
upright. (Refer to Fig. A-1, pg. 13 for relay rack
assembly.)
NOTE: If installing battery without relay rack,
follow standard module instructions for battery
assembly. (Refer to Fig. A-2, pg. 13) for assembly
instructions.)
2. Insert module base support between the frame
uprights (level and anchor). Anchor bolts are not
included.
3. Using the lifting slings provided, remove the top
module from the shipping pallet and bolt it to the
module base support. (Refer to Fig. A-3 on pg. 14,
Steps 1 and 2.)
CAUTION: Never lift more than one module at
a time with the lifting slings.
4. Remove the next module and bolt it to the first
module. Repeat this procedure until the battery is
installed to its proper configuration. (Refer to Fig.
A-3 on pg.14, Steps 3 and 4.)
NOTE: Use the schematic supplied with the battery.
5. Insert the stabilizing bracket and bolt it to the top
module. (See Fig. A-4, pg 14, for instructions.)
1
Содержание Unigy II
Страница 8: ...8 Fig 3 1 Fig 3 2 Fig 3 3...
Страница 9: ...9 Fig 4 2 Fig 4 3...
Страница 10: ...10 Fig 4 4 Fig 4 5...
Страница 11: ...11 Fig 4 6 Fig 4 8...
Страница 12: ...12 Fig 4 11 Fig 4 13...
Страница 14: ...14 Fig A 3 Fig A 4 APPENDIX A...