background image

Connection diagram 

 

 

 

Installation

 

Verification: 

Verify that the instrument configuration is according to your order.

 

 
Aux. supply:

 Connect terminals to correct voltage. See label on unit. 

 

Measuring circuit:

 Connect PE to ground and P to a phase (if it is a 3-phased network – connect to 

any of the phases). 
 

Warning: 

If a high-voltage “MEGGER” is used,  the SIM-2  must  be disconnected  at terminal “P” 

before testing is carried out. Ignoring this may result in damage to the SIM-2. 

 

Adjustment of the set point 

When the selector on the front is placed in Test mode, the meter indication shows the set point 
setting directly. Set point potentiometer on the rear side is used for changing value. 
 
Remember to return the selector to normal mode after setting! 
 

Set point test/control

 During the first 10 seconds after power-up, the meter pointer shows the 

actual set point setting and activates its relay. 

 
 

 