
3.3 Generator synchronisation
Before
After
Load
G
Load
G
Mode
: Turning the function selector to
Generator synchronisation
does not change the mode in the controller(s).
After starting the genset(s) and checking the AC wiring:
1. To verify that the generator is running, check that the genset engine LED (1) on the display unit is green.
2. To make sure that the voltage and frequency is OK, check that the genset voltage LED (2) on the display unit is green.
3. Turn the function selector to
Generator synchronisation
. This forces the genset(s) to make a dynamic synchronisation to the
mains. The synchronisation is shown on the display unit screen. When the genset(s) are synchronised, the controller(s)
automatically close the generator breaker(s). When the first genset's generator breaker is closed, the breaker LED (3) is green.
4. The genset(s) run with a minimum of load while waiting for the next step.
NOTE
The minimum load is adjusted in parameter 7023. The default is 5% of the nominal power.
RMB display unit LEDs
Automatic Gen-set Controller
VIEW
LOG
Auto
Alarm Inh.
Self check ok
Power
SEL
BACK
MODE
JUMP
START
INFO
STOP
Alarm
Alarm
multi-line AGC
On
On
Load
Run
G
For more information on the display unit, see the
AGC Operator's manual
.
OPERATOR'S MANUAL 4189340730C UK
Page 9 of 15