Fig. 1 The DEHLER 35CWS is lowered into the water
Rigging Up
Make sure that
-
The crane & slings have a safe lifting
capacity of at least 6 tons.
-
The slings are of adequate width and
will not scratch the gelcoat.
-
The slings will not push in the guardrails
(loosen the guardwires)
-
The propeller, shaft and log impellor
remain clear of the slings (if necessary
retract the log impellor)
-
All seacocks are closed
If necessary, use a sufficiently wide
crossframe (see illustration)
Your first task
Before the propeller turns for the first time,
the shaft seal needs to be vented. Squeeze
the seal with two fingers until a small
amount of water emerges at the front.
ATTENTION !
Venting should be repeated each time the boat
is hauled out of the water. (Venting must also
be carried out after drying out.)
Fig 2. Venting the shaft seal.
Dehler 35 cws
6
https://www.boat-manuals.com/
Содержание 35 cws
Страница 23: ... The sail trimming table goes in here Dehler 35 cws 23 https www boat manuals com ...
Страница 26: ...Fig 26 SOLIMAR wheel steering system Dehler 35 cws 26 https www boat manuals com ...
Страница 38: ...https www boat manuals com ...
Страница 39: ...https www boat manuals com ...
Страница 40: ...https www boat manuals com ...
Страница 41: ...Owners Notes https www boat manuals com ...
Страница 42: ...https www boat manuals com ...