01.01.2022
ASSEMBLY AND OPERATING MANUAL DEGER D25H, D60H, D80 and D100
Page 21
6.2
Assembling the aluminium profiles
ATTENTION!
The module configuration layout provided by DEGER together with the order confirmation is
binding!
The solar modules must not be arranged in any other way, than described in the module
configuration layout from DEGER.
The total module surface is determined with the DEGER planning tool, specifically for the location.
Defects caused by failing to comply with the module configuration layout are not covered under
warranty.
ATTENTION!
No aluminium profiles must be mounted in the middle area of the central slewing bolt.
A distance of at least 600 mm from the middle must be free of aluminium profiles.
Failure to comply may cause damage to DEGER systems or modules.
The aluminium profiles project from the
base frame at top and bottom.
This projection is calculated as follows:
Length aluminum profile - Width bearing frame
2
=Projection
Example:
5,90 m-2,60 m
2
=1,65 m
min.
690 mm
projec
ti
on
?
W
idth of bas
e fra
me
= 2
.60 m
projec
ti
on
?
MTH clamps for
fastening the
aluminium profiles