background image

 

 

operating manual

dry stove with water system, fired with pellet

DEFRO HOME AQUAPELL

13 kW 

translation of original operating manual 
issue 4 
July 2020 

Содержание AQUAPELL

Страница 1: ...operating manual dry stove with water system fired with pellet DEFRO HOME AQUAPELL 13 kW translation of original operating manual issue 4 July 2020...

Страница 2: ...i by przekazana wraz z piecem kominkowym w przypadku odst pienia w asno ci innej osobie This Declaration of Conformity becomes invalid if any changes have been made to the Dry Stove if its constructio...

Страница 3: ...of the Warranty Card to the following address DEFRO Sp z o o Sp k Centrum Serwi sowe Ruda Strawczy ska 103a 26 067 Strawczyn fax 41 303 91 31 serwis defro pl By sending back your Warranty Card you wil...

Страница 4: ...2 7 CLEANING AND MAINTENANCE 12 7 1 1 Water system 12 7 2 Basic operations and cleaning by the user 12 7 2 1 Cleaning before each starting 12 7 2 2 Every day service 13 7 2 3 Every week service 13 7 2...

Страница 5: ...in this way 2 BASIC SAFETY RULES 2 1 SAFETY WARNINGS The national and local provisions should be met Equipment should be installed in compliance with the legal standards applicable in the given locati...

Страница 6: ...perties compatible with the rec ommendations of this operating manual Check and clean flue gas discharge ducts a connect ing piece to flue periodically Store this manual carefully because it should be...

Страница 7: ...er are given in brackets 2 Device weight depends on the selected design version and its equipment 3 The stove is factory adapted for combustion of pellet with a diameter of 6 mm pellet with a diameter...

Страница 8: ...and if they are in good technical condition 5 2 WORKING ENVIRONMENT Dry stove should be installed in compliance with the re quirements of thecurrentlyapplicablestandards and le gal regulations and de...

Страница 9: ...hermore the air intake should be directly connected with the room where the stove is to be installed protected with grille metal net or suitable cover not restrict ing minimum cross section located in...

Страница 10: ...automated which allows automatic stoppage of operation if the safe temperature of water is exceeded Dry stove is ready for operation in closed system because it is equipped with diaphragm vessel insta...

Страница 11: ...ith water should be carried our using installed fixtures for filling and emptying which should be located in the lowest point of the heating system This process should be carried out slowly in order t...

Страница 12: ...hich will disconnect supply from the stove and will prevent damage of the stove and central heating system 7 CLEANING AND MAINTENANCE All operations related to cleaning of all components should be car...

Страница 13: ...moval of dust from heat exchanger chamber if ash has been accumulated in the chamber it should be removed 7 2 4 EVERY MONTH SERVICE If the stove is used extensively then you should remove the soot fro...

Страница 14: ...d 8 TROUBLESHOOTING Some anomalies indicating irregularities in operation can occur during operation of the equipment It can be caused by incorrect instal lation of the equipment without observation o...

Страница 15: ...er subject of agreement dry stove under the condition that the product has been fully paid Due to suitable proven and unified standards of sales the war ranty covers only product purchased in authoriz...

Страница 16: ...free of charge The guarantor can charge the costs connected with warranty claim only incase when claim is not accepted as a result of statingcircumstances which are listedin points 17 and 18 men tione...

Страница 17: ...equipment operation by the service within 60 days from date of carrying out the repair DEFRO will issue appropriate invoice for replace ment repair of the subject component with enclosed expertise pro...

Страница 18: ...18...

Страница 19: ...vered as complete the device showed no failure during the first start up carried out by a service company has received the Operating Manual and equipment s installation manual with this Warranty Card...

Страница 20: ...20 14 CARRIED OUT WARRANTY REPAIRS AND MAINTENANCE No date fault description repaired element description of repairs comments Stamp and signature of Service 1 2 3 4 5 6 7 8 9 10...

Страница 21: ...vered as complete the device showed no failure during the first start up carried out by a service company has received the Operating Manual and equipment s installation manual with this Warranty Card...

Страница 22: ...22...

Страница 23: ...nician Way of fault removal Advice DESCRIPTION END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint Duration of repair Fault defect has been removed the equ...

Страница 24: ...24...

Страница 25: ...nician Way of fault removal Advice DESCRIPTION END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint Duration of repair Fault defect has been removed the equ...

Страница 26: ...26...

Страница 27: ...nician Way of fault removal Advice DESCRIPTION END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint Duration of repair Fault defect has been removed the equ...

Страница 28: ...28...

Страница 29: ...29 19 REGISTER OF INSPECTIONS OF SMOKE DUCTS date stamp and signature of chimneysweep date stamp and signature of chimneysweep...

Страница 30: ...specification CO emission in combustion products 0 0098 0 0081 1 13 O2 122 mg m3 101 mg m3 1 13 O2 PN EN 14785 2009 OGC emission in combustion products 2 mg m3 4 mg m3 1 13 O2 Commission Regulation EU...

Страница 31: ...zy ska 103A PARAMETERS OF THE EQUIPMENT UNIT MODEL IDENTIFICATION MYPELL Energy efficiency class Direct thermal power kW 2 9 Indirect thermal power kW 10 2 Energy Efficiency Index EEI 134 Efficiency a...

Страница 32: ...509 702 720 509 577 900 DEFRO Sp ka z ograniczon odpowiedzialno ci Sp ka komandytowa 00 403 Warszawa ul Solec 24 253 Manufacturing plant Ruda Strawczy ska 103 A 26 067 Strawczyn tel 41 303 80 85 biuro...

Отзывы: