Installation Guidelines

PROFILE 300 

 

DEFENCELL

Profile 300 1.25m high:

Five layers - Profile 300:11 to 300:07

PAS68 - 7500(N2):64/90:0/0

Profile 300 1.50m high:

Six layers - Profile 300:11 to 300:06

PAS68 - 7500(N3):80/90:2.5/0

PROFILE PANEL SIZES

Unit

Profile 

300:04

Profile 

300:05

Profile 

300:06

Profile 

300:07

Profile 

300:08

Profile  

300:09

Profile 

300:10

Profile 

300:11

Panel Length

mm

4970

Panel Width

mm

1273

1591

1909

2227

2546

2864

3182

3500

Содержание PROFILE 300

Страница 1: ...N2 64 90 0 0 Profile 300 1 50m high Six layers Profile 300 11 to 300 06 PAS68 7500 N3 80 90 2 5 0 PROFILE PANEL SIZES Unit Profile 300 04 Profile 300 05 Profile 300 06 Profile 300 07 Profile 300 08 Profile 300 09 Profile 300 10 Profile 300 11 Panel Length mm 4970 Panel Width mm 1273 1591 1909 2227 2546 2864 3182 3500 ...

Страница 2: ...age 8 hour shift with a 16T excavator with 1m3 ditching bucket plus operator may achieve the following Using the frame method Using two Profile frames Can complete 25 35 linear metres per shift Not including landscaping Note These are a guide to installation of Profile300 The production rate will increase or decrease depending on the following Distance excavator has to haul the fill Type of excava...

Страница 3: ...e frame as shown below Using Pins If the frame is not used the same can be achieved by using pins Using a building line as a guide pins can be placed into the ground along the long sides of the construction at 368mm centres and across the ends at 318mm centres In the same way as when using a frame the cells are placed over the pins until the Profile 300 is tight and symmetrical Start with the labe...

Страница 4: ...irst Profile 300 is in position the next Profile 300 is opened out and aligned in the direction of construction with the female end of the new Profile 300 interlocked with the male end of the first Pin out the new Profile as previously until the Profile is tight and symmetrical Stage 3 Filling Fill should be distributed evenly across the panel width taking care not to dump fill in one area Even di...

Страница 5: ... or you have finished a section depending on your construction plan move to the next layer Using frame First change the frame to the next size down as per the frame guide Place on the fabric panel as previously instructed Position the frame on top of the layer below checking it is central to the berm This will give you spacing of 160mm either side of the panel below or roughly half a cell Position...

Страница 6: ... 300 Use this at the end of the run to complete the layer Then place a new Profile panel on the frame and join to the filled half panel Profile 300 1 50m There are three distinct differences between the Profile 3001 25mhighandthe1 50mhighduringconstruction 1 The Profile 300 1 50m has an extra layer using the Profile 300 06 on top 2 Connect all the end cells between panels with a cord tied with a r...

Страница 7: ...d grass or turf can be laid This will also allow it to blend in and be more aesthetically pleasing End walls walk ways and integration of Vehicle Security Barriers VSB During the construction of the berm several things may have been incorporated into the design End berm wall Pedestrian aperture Integration withVehicle Security Barrier Pedestrianaperturecanbeinstalledwithinthebermbut must not be an...

Страница 8: ...ndboltssupplied 3 Insert the four cross pieces two end and two centre and connect using the shortnutsandbolts Theallyellowcross pieces are used for the Profile 300 11 4 For subsequent smaller Profile panels change the cross pieces to the corresponding size 5 After use disassemble and clean the frame and return to packing case 11 10 9 8 7 6 PROFILE 6 7 8 9 10 11 PROFILE 11 10 9 8 7 6 6 7 8 9 10 11 ...

Отзывы: