![DeDietrich Vivadens MCR-P 24 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/dedietrich/vivadens-mcr-p-24/vivadens-mcr-p-24_user-manual_2462498025.webp)
4. Wait until the temperature drops below 40°C and the radiators
seem cold before filling the central heating system.
5. Open the valve.
6. Close the valve.
7. After filling the installation, switch the boiler on.
8. Set the room thermostat or the regulator.
9. Set the radiator valves.
CAUTION
Filling and bleeding the installation 2 times a year should
be sufficient to obtain an adequate hydraulic pressure. If
it is often necessary to top up the installation with water,
contact your fitter.
6.4
Bleeding the heating system
It is essential that you bleed any air in the calorifier, the conduits or
the taps to prevent the annoying noises likely to be produced during
heating or when tapping water. To do this, proceed as follows:
1. Open the valves on all radiators connected to the heating system.
2. Set the room thermostat as high as possible.
3. Wait until the radiators are hot.
T000185-A
T000847-A
1
2
3
4
T000181-B
T000183-A
T000184-A
MCR-P 24/28 BIC PLUS
6. Checking and maintenance
170915 - 127686-04
24
Содержание Vivadens MCR-P 24
Страница 1: ...Vivadens EN Wall hung gas condensing boilers MCR P 24 28 BIC PLUS User Guide 127686 04...
Страница 4: ...3 170915 127686 04...
Страница 40: ...11 Appendix MCR P 24 28 BIC PLUS 39 170915 127686 04...
Страница 41: ...MCR P 24 28 BIC PLUS 11 Appendix 170915 127686 04 40...
Страница 42: ......
Страница 43: ......