DeDietrich CBB 15 E Скачать руководство пользователя страница 5

5

16/06/2009 - 300019729-001-C

CBI-II / CBB 15 E

3. 

Description

3 Description

3.1 Installing the heating

Depending on the heating installation, certain components can be
suppressed or added. Get your fitter to explain your installation to
you.

Description

Operation

CBI-II

Reverse combustion log-fired 

boiler

Burns wood in complete safety and protects the environment. Removes the heat from 
the fumes given off by combustion and transfers it to the heating water.

CBB 15 E

Log-fired boiler with natural 

draught

Burns wood in complete safety and protects the environment. Removes the heat from 
the fumes given off by combustion and transfers it to the heating water.

EA108

Wall module for elevating the 

return temperature

Used to read the return temperature. Stays off if the return temperature is lower than 
60°C.

ML9

Thermostatic module for elevating 

the return temperature

Used to prevent the return of water colder than 60°C into the boiler.

Logs

The natural energy of wood is converted into heat by combustion in the Bioenergy 
boiler.

Buffer tank

PS / PSB

DC / QUADRO

Used for storing hot water extracted from the biofuel boiler (max. 85°C). 
Compensates for any differences between heat production and needs.
Solar use with DC / QUADRO

Domestic hot water tank

LIGHT / DUO / TRIO

Maintains a reserve of domestic hot water for the household (e.g. shower) with an 
electric back-up for the summer.
Solar use with LIGHT / DUO / TRIO

DIEMATIC VM

Regulation

Optimally ensures the desired temperature on the premises and saves on fuel, 
whatever the outside temperature.

Differential regulator

Controls the domestic load pump.

Radiators or underfloor heating

Transfers the heat from the heating water to the premises.

8962N094A

Содержание CBB 15 E

Страница 1: ...CBI II CBB 15 E Reverse combustion log fired boiler User Guide 300019729 001 C EN...

Страница 2: ...ommissioning 9 4 2 Subsequent start ups by the final user at least at the beginning of the heating season 9 4 3 Ignition 10 4 4 Adding more logs 10 5 Cleaning and regular servicing 11 5 1 Cleaning the...

Страница 3: ...larity shown on the terminals phase L neutral N and earth 4 In the event of a power cut Do not open the boiler doors Do not add any fuel Check regularly that the installation contains water and is pre...

Страница 4: ...d Dry wood stored under cover for at least 2 years with a low humidity level less than 20 of the gross mass Logs with a maximum diameter of 150 mm Maximum length of the logs For improved combustion qu...

Страница 5: ...ture Stays off if the return temperature is lower than 60 C ML9 Thermostatic module for elevating the return temperature Used to prevent the return of water colder than 60 C into the boiler Logs The n...

Страница 6: ...boiler to the radiators Motorised mixing valve Adapts the outlet temperature from the boiler to the radiators in such a way as to obtain the desired room temperature whatever the outside temperature...

Страница 7: ...ol panel 4 Air flap lever 5 Air regulator flap 6 Air regulator flap chain 7 Output modulator 60 90 C 8 Safety exchanger To be connected by the fitter 9 95 C limiter thermostat except CBB 15 E 10 Senso...

Страница 8: ...switch 14 Boiler thermometer 15 Flue gas thermostat for extractor fan 16 Safety thermostat with manual reset 110 C 17 Boiler thermostat Boiler CBB 15 E 13 General ON 1 OFF 0 switch DHW pump 14 Boiler...

Страница 9: ...ed Remove the safety thermostat hood and press the reset button with a screwdriver except CBB 15 E 3 Carry out the boiler ignition operations See chapter Ignition 4 Set the output modulator to 80 C 5...

Страница 10: ...door 8 Push the lever to close the air flap 9 Set the flue gas thermostat between Min and Max when in operation The fan must continue to turn except CBB 15 E When the fuel has been consumed the fan i...

Страница 11: ...boiler Every 3 to 7 days Turn the boiler off before cleaning See chapter Stopping the boiler 1 Turn the flue gas thermostat to 0 Ignition except CBB 15 E 2 Open the loading door 3 Sweep the ashes thr...

Страница 12: ...clean with a brush Remove the ashes via the bottom inspection hatch 5 4 Cleaning the extractor fan Around 1 time per month except CBB 15 E Remove the extractor fan Clean the vanes Check the squarenes...

Страница 13: ...e heating surfaces in the boiler Precautions to take if there is a danger of frost Heating circuit Use a correctly dosed antifreeze to prevent the heating water freezing If this cannot be done drain t...

Страница 14: ...the boiler on The extractor fan is clogged Clean the extractor fan See chapter Cleaning the flue gas collector Around 1 time per month Flue gases are escaping from the loading door The door seals are...

Страница 15: ...ly to the replacement or repair of parts damaged by normal wear and tear negligence repairs by unqualified parties faulty or insufficient monitoring and maintenance faulty power supply or the use of u...

Страница 16: ...N 49 0 25 72 23 5 49 0 25 72 23 102 info dedietrich de Weggevoerdenlaan 5 B 8500 KORTRIJK 32 0 56 23 75 11 Bahnstrasse 24 CH 8603 SCHWERZENBACH 41 0 44 806 44 24 41 0 44 806 44 25 39 rue Jacques Stas...

Отзывы: