7.2
Commissioning procedure
Warning
Initial commissioning must be done by a qualified professional.
If adapting to another type of gas the boiler must be adjusted
before switching it on.
See
Adaptation to a different gas type, page 0
1. Open the main gas tap.
2. Open the boiler gas tap.
3. Switch the power on with the boiler's on/off switch.
4. Set the components (thermostats, control) so that heat is demanded.
The start-up program will start and cannot be interrupted. During the
start-up cycle, all segments of the display are shown briefly.
Error during start-up procedure:
In the event of a fault, a message with the corresponding code is
displayed.
The meaning of the error codes can be found in the error table.
See
Manual for the control panel.
7.3
Gas settings
7.3.1
Checking/setting the combustion
Important
Checking and/or setting the boiler C 630 ECO: the properties
described and the instructions apply to each boiler module. Make
sure that the other boiler module is out of operation during this
check and/or setting.
1. Unscrew the cap from the flue gas measuring point.
2. Insert the probe for the flue gas analyser into the measurement
opening.
Warning
During measurement, seal the opening around the sensor fully.
Important
The flue gas analyser must have a minimum accuracy of ±0.25%
O
2
.
3. Measure the percentage of O
2
in the flue gases. Take measurements
at full load and at part load.
Performing the full load test (IniControl)
1. Press the two keys at the same time.
The
symbol appears on the display. The boiler is now set to full
load.
Fig.53
Flue gas measuring point
AD-0000532-01
2
1
Fig.54
Setting to full load
AD-4000059-01
7 Commissioning
50
7600532 - v.11 - 13122018
Содержание C 330 ECO
Страница 90: ...14 Appendix 90 7600532 v 11 13122018...