De Dietrich Gas 310/610 ECO
It is advisable (preferable) to install the Gas 310 ECO as follows:
Place the crate c/w the boiler in the
boiler room. Make sure there is
enough room at one end of the crate
for the boiler and ramp and clearance
for the crate to be removed (at least
10ft [3M]).
Place the 4 support pads under the
adjustment bolts.
Use the adjusting bolts to jack up the
boiler – lifting it clear of the wheels
and with the top of the condensate
collector level.
Fit the siphon assembly.
Use the plastic packaging to protect
the boiler until required for use.
Service side dimension ‘B’, for servicing it is recommended that an
additional 8 inches [200mm] be added, but is not absolutely required.
If the control is orientated to the short end, dimension A will need to
be increased by 19.5 inches [495mm].
At least 16” [400mm] above the boiler
Always transport the boiler in the protective packaging whenever possible.
Important!!
Remove fixing strips, packaging lid and all other packaging, leaving the boiler on the pallet.
Place the packaging lid on the end of the pallet, creating a ramp – secure with screws.
Roll the boiler, on its wheels, off the pallet and down the ramp to the boiler room floor.
WARNING!
Use retaining straps to control the rate of travel – Do Not stand in front of the boiler!
▪
Maneuver the boiler to required final position.
The pallet lid can be used as a rocking ramp to
convey the boiler over obstacles, such as thresholds, etc.
The wheels are designed for transport purposes only and
MUST NOT be used when the boiler is in its final position!
Important!!
Additional protection may be required if site conditions
warrant it – overhead builders working, insulation, etc.
Important!!
Important:
unit
Do not install boiler on carpet or other combustible materials.
Never stand on the
boiler. The boiler casing is not designed for excessive force or weight.
A
B
C
D
E
inch
12
31.5
6
6
24
mm
300
800
150
150
600
Boiler base dimensions
Boiler
Model
A
B
C
D
E
F
G
inch
Mm
inch
mm
inch
mm
inch
mm
inch
mm
inch
mm
inch
mm
310-5
62
39/64
1590
28
23/64
720
2
11/64
55
44
1/64
1118
5
23/32
145
24
13/16
630
1
25/32
45
310-6
310-7
45
61/64
1980
59 3/8
1508
310-8
310-9
table 03[b] - base - foundation dimensions
A
C
B
A
B
A
A
C
C
B
B
A
A
E
B
A
B
A
C
C
Single boiler “left hand version”
Single boiler “right hand version”
2 boiler “one right & one left” end to end
2
boiler “one right
&
one left” back to back
Содержание 310 ECO Series
Страница 32: ...31 De Dietrich Gas 310 610 ECO 8 4 Wiring Diagram fig 18 wiring diagram Fb 12AT ...
Страница 33: ...32 De Dietrich Gas 310 610 ECO 8 4 Wiring Diagram Continued ...
Страница 67: ...66 De Dietrich Gas 310 610 ECO 15 5 Exploded view and spare parts list right hand version shown ...
Страница 70: ...69 De Dietrich Gas 310 610 ECO 16 ADDENDICES ...
Страница 71: ...70 De Dietrich Gas 310 610 ECO 16 1 Control menu Fig 40 Control menu flow chart ...
Страница 72: ...71 De Dietrich Gas 310 610 ECO 16 2 Shut off codes ...
Страница 73: ...72 De Dietrich Gas 310 610 ECO 16 2 Shut off codes Continued Table 25 Shut off codes ...