Instruction
manual
Material lock system Quick-Dush
ECO-LINE
Stand: Nov 2020
Seite 8
7 Assembly instruction
The lock system can be assembled easily and quickly with 2 persons.
7.1 Preparation:
Previous to the assembly of the personnel lock:
Determine the exact position and the ground plan
The floor must be clean and flat
7.2 Set up:
Align bottom elements flatwise next to each.
Attention:
To prevent unnecessary hose lengths, the sewage aspiration port of the cleaning
chamber should have the shortest route to the filtering station. Please clean holder
bracket of tub before inserting the door and side elements!
load capacity of single floor element: max. 500 kg
correct
wrong