DL28 Installation and User Manual
3.2.1
TEST1
Following terminal screen shows execution of
TestPort
system application. After the
TestPort
is
started, user is asked to connect cross-linked RJ45 serial cable to ports
S1
and
S2
, confirming this
action with
y
and
ENTER
keys.
Figure 11: Terminal screen output after TEST1 execution
After communication testing in both ways (S1--->S2 and S2--->S1) the TEST1 is completed and
application advances to TEST2 automatically.
14.05.2013.
15.