Decagon Devices AquaLab 4TE Скачать руководство пользователя страница 8

Decagon Devices, Inc  

 

June 28, 2016 11:24 AM 

8

Remarks:     N/A 

 

 

           

                
    

Qualified by:

Date: 

    Initials: 

   

2.4 Environmental Conditions

Installation of the AquaLab Water Activity instrument includes placing the instrument on a level surface in a 
location where the temperature remains fairly stable.  This location should be well away from air conditioner 
and heater vents, open windows, outside doors, or other items that may cause rapid 
temperature fluctuation.  

      

Location 

     Satisfactory  

 

 Not Satisfactory

Adequate Power 

 

 

 Satisfactory  

 

 Not Satisfactory

Stable 

Surface 

     Satisfactory  

 

 Not Satisfactory

Temperature   

 

  

 Satisfactory  

 

 Not Satisfactory

Remarks:    N/A 

             

                
               
 

Qualified by:

Date: 

    Initials: 

   

2.5 Power Up Test

After finding a good location for the AquaLab Water Activity meter, plug the power cord into the back of the 
unit and a standard AC outlet. The ON/OFF switch is located in the lower left corner of the back panel.  

Instrument is powered upon switching on 

    Yes 

 No  

Remarks:   

N/A 

             

          

Содержание AquaLab 4TE

Страница 1: ...Installation Qualification Operational Qualification Protocols and Instructions AquaLab 4TE 4TEV 4TE DUO and 4TEV DUO Decagon Devices Inc June 28 2016 11 24 AM 1...

Страница 2: ...testing System information Sensor Verification Equipment Familiarization Training Record Deficiencies and Corrective Actions Section 1 Section 2 Section 2 1 Section 2 2 Section 2 3 Section 2 4 Section...

Страница 3: ...Final approval for the qualification has to be completed after review of the qualification documentation filled out during performance of the qualification procedures IQ OQ protocols The customer repr...

Страница 4: ...equipment users are to be instructed in basic operation functionality instrument parameters as well as on basic hardware features of the installed system including routine maintenance and cleaning pro...

Страница 5: ...vity instrument The purchased AquaLab Water Activity instrument undergoing qualification is located at Company Name Department Address City State Country Zip code Postal Code Phone Number 2 1 Equipmen...

Страница 6: ...Not Complete N A DUO Quick Start Guide Complete Not Complete N A DUO only Remarks N A All parts were received as ordered and the delivery is complete Yes No Any parts that were missing at the time of...

Страница 7: ...n Satisfactory Not Satisfactory Accepted Other Satisfactory Not Satisfactory Accepted Remarks N A Qualified by Date Initials Severe damage to any of the delivered parts interrupts the installation qua...

Страница 8: ...de doors or other items that may cause rapid temperature fluctuation Location Satisfactory Not Satisfactory Adequate Power Satisfactory Not Satisfactory Stable Surface Satisfactory Not Satisfactory Te...

Страница 9: ...es Initial Qualification Requalification Decagon Devices Authorized Representative Name Function Company Date Signature Initials Installation Qualification was reviewed by the representative of the sy...

Страница 10: ...ies 4 line of instruments contain a chilled mirror dewpoint sensor for determining water activity The 4TEV model contains both the chilled mirror sensor and a capacitance relative humidity sensor The...

Страница 11: ...specification clean the instrument and follow the procedure in the User s Manual to perform a linear offset Repeat the verification process with fresh standards Dew Point Sensor Volatiles Sensor TEV o...

Страница 12: ...Qualified by Date Initials Completeness of Operational Qualification OQ Operational Qualification was completed and documented according to manufacturers guidelines Initial Qualification Requalificat...

Страница 13: ...agon Devices to learn about available training and seminars Authorized support specialists perform the qualification services offered by Decagon Devices Name Date Name Date Name Date Name Date Name Da...

Страница 14: ...n Once accept able results are obtained the deficiency is accepted by checking the accepted box under the deficiency Deficiency Corrective Action Accepted Initial Deficiency Corrective Action Accepted...

Отзывы: