Page 15/37
May 2021
WOOD CHIPPER | User manual
3.
INSTALLATION
The machine is delivered in transport configuration from the
factory. Always use tools, equipment and forklift trucks with
suitable dimensions and power for the installation. Always
make sure there are two persons present to lift, move and
assemble the machine.
When the machine is delivered, follow these instructions
during the preparation:
1.
Make sure there are no people, animals and especially
children in the area.
2.
Use a forklift truck to lift or move the pallet/machine.
Keep the center of gravity near to the ground.
3.
Move the machine to the location where you want to
install the machine. Make sure there is sufficient space
around the machine.
4.
Cut through the fastening straps.
5.
Lift the top part (feed hopper) and carefully move it to one
side by using a forklift truck.
6.
Position the individual components next to the machine.
7.
Remove the protective film/packaging from all
components.
Transport fastening straps
and crate
Lifting the feed hopper
Gather all components