12
/
12
WWW.DDTOP.COM
Maintenance and
Inspection Items
Methodology
General cycle
Check for leaks, etc.
Visual Inspection
12 Months
Confirmation of wiring port
seals
Visual Inspection
12 Months
Confirmation
of
fluid
indication
Compare
with
pump
capacity, etc.
12 Months
Check whether constant
flow is maintained
Check and repair
Daily
Check for internal corrosion Disassembly and check
Periodic Maintenance
Check for internal buildup
Disassembly and check
Periodic Maintenance
9.2 Troubleshooting
After Installation of Instrumentation
Failure
Reason
Solution
No Flow
Insufficient
pressure
on
supply.
Increased
pressure
on
supply.
Foreign body contamination,
blockage
Check and Clean.
Flow is too small.
Flow confirmation.
Inadequate
flow
fluctuations
Insufficient
pressure
on
supply.
Increased
pressure
on
supply.
During Operation of Instrumentation
Failure
Reason
Solution
Flow Interruption
Block
Wash and Clean
Fluctuating Flows
Mechanical
fatigue
or
isolation breakage of internal
parts of the constant flow
valve.
Check and Replace
10 Disassembly
10.1 Warnings
Before disassembly, attention should be paid to hazardous process conditions, e.g., pressure in the
vessel, hot, corrosive, or toxic media, etc.
10.2 Waste removal
Please follow the existing guidelines for waste disposal in your region.