![DDL S-HEF Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/ddl/s-hef/s-hef_installation-manual_2460633002.webp)
(a)
INSTRUCTIONS
1
Mark the lower edge of the divisional building entry on the
internal wall of the building
2
Place the drilling template (included in delivery) against the
wall and mark all five drill holes on the wall
3
Drill dowel holes into the wall 4 x Ø 10 x 60 and insert
dowels
(included in delivery)
4
Choose the drilling diameter for centric penetration
opening in building and drill
- up to 9 mm OD* cable/pipe
Ø 10 mm
- up to 19 mm OD* cable/pipe
Ø 20 mm
- up to 29 mm OD* cable/pipe and glass fibre cable 2 x 7
Ø 30 mm
- up to 36 mm OD* cable/pipe
Ø 40 mm
- up to 40 mm OD* cable/pipe
Ø 45 mm
* outside diameter
5
Lead the cable/pipe through the wall to desired length,
facing the ground
- when using type S-HEF EDS lead the cable through the
red dirt guard sealing beforehand, facing the ground
(2 x 7 or 12 – 16)
- when using types S-HEF DD and DD GF first lead the
cable through the S-HEF housing and then through the
(adapted) red segmental ring seal insert
6
When using the red segmental ring seal insert, adapt it to
the cable/pipe diameter by removing the appropriate
segmental rings. See section “Adapting the segmental ring
seal insert” for instructions
7.1
7
Press the red seal insert over the cable/pipe to the wall
(caution: open segmental ring side must be facing the
wall!)
8
Pull the S-HEF housing with inserted rubber sealing plate
over the cable/pipe and press it to the wall while pressing
the red seal insert into the opening of the housing back
9
Screw together with four pieces of hexagon screws 7 x 60
and washers (included in delivery) until the rear housing
frame with inserted rubber sealing plate lies completely
against the wall and is securely fastened.
When using type S-HEF DD install another assembly kit
facing the ground by repeating steps
6
–
9
.
When using type S-HEF ED protect the penetration on
the external wall against impurities with sealing material
(not included in delivery, e.g. foam) upon completion.
SELECTION OF SEGMENTAL RING
1
3
5
6
8
9
2
4.1
4.2
7.1
7.3
7.2
ADAPTION OF SEGMENTAL RING SEAL INSERT
• Determine the adequate
segmental ring diameter
with the help of the table
• Open the segmental ring
seal insert at the junction (a)
• Unfold the segmental
ring seal insert
• Detach the segmental ring blind cover (1) and the surplus
segmental rings (2 – 7) anually from inside to outside.
Caution: detaching too many segmental rings will impair the
tightness
• Place the segmental ring insert around the cable/pipe, close
it and press it to the wall. Caution: open segmental ring side
must be facing the wall
(2 – 7)
(1)
Segmental ring
element
cuts at
[mm]
cable diameter
from [mm] to [mm]
1 (blind cover)
10
6
10
2
14
>10
14
3
18
>14
18
4
24
>18
24
5
30
>24
30
6
36
>30
36
7
42
>36
40