CABINET PREPARATION
10
8-7/16"
22-3/4"
26-1/2"
23-1/4"
3" To Center Line
of Gas Inlet
1/2"
1/2"
5/8"
Cabinet face for installation
with projecting control panel
Cabinet face for installation
with flush control panel
2-1/2"
Countertop level
Fig. 4
0” clearance
0” clearance
30"
15/16"
36" Min. to
Combustibles
26" Min. to
Combustibles
without backguard
12"
Fig. 5
STANDARD INSTALLATION
ISLAND INSTALLATION
Содержание CS-364G
Страница 17: ...CS 36 48 WIRING DIAGRAM 16 17473 01 eps Rev A 08 02 ...
Страница 18: ...CS 36 48 SCHEMATIC 17 17473 02 eps Rev A 08 02 ...
Страница 19: ...CS 485 WIRING DIAGRAM 18 17473 03 eps Rev A 08 02 ...
Страница 20: ...CS 485 SCHEMATIC 19 17473 04 eps Rev A 08 02 ...
Страница 23: ...NOTES 22 ...
Страница 24: ...NOTES 23 ...
Страница 25: ...NOTES 24 ...