DCM SOLUTION ESV700 Скачать руководство пользователя страница 21

 

Sanitizing tunnel 

ESV700

 

www.dcm.com.ar

 

Installation Manual

 

Page.:  21of23  

6.3  Pressure valve 

In case of willing to correct the pressure, you can change it through the 
pressure valve as shown in the pressure valve page. 

 

 

Содержание ESV700

Страница 1: ...Solution S A Sanitizing tunnel ESV700 Installation Manual All information contained in this document including illustrations and specifications are reliable at the date of its publication but is subje...

Страница 2: ...carefully checked and is reliable as of the date of its publication but is subject to change without prior notice DCM Solution S A assumes no liability for any inaccuracy error or omission in this ma...

Страница 3: ...rmation_______________________________________ 7 3 1 Location of the components ______________________________ 7 4 Installation ________________________________________________ 8 4 1 Required tools __...

Страница 4: ...andard characteristics SAE1010 epoxy painted Steel cabinet Poweron off button Capacity of more than 500 cars hour 2 rows of 4 industrial spray nozzles with anti drip 1 liquid tank 45liters System cons...

Страница 5: ...2 2 4 Electric power supply Voltage 12VDC 5A 2 2 5 Electric consumption Electric consumption 50 W max 2 2 6 Environmental conditions Operating Temperature 0 C to 40 C Storage Temperature 10 C to 55 C...

Страница 6: ...Sanitizing tunnel ESV700 www dcm com ar Installation Manual Page 6of23 2 2 8 Dimensions Characteristic mm Length 2250 Width 1510 Height 1580...

Страница 7: ...Sanitizing tunnel ESV700 www dcm com ar Installation Manual Page 7of23 3 Technical information 3 1 Location of the components...

Страница 8: ...on can be carried out with the help of steel or chemical drills by placing the drills in a position that matches with the anchoring holes of the cabinet either by means of the installation plane or wi...

Страница 9: ...ng tunnel ESV700 www dcm com ar Installation Manual Page 9of23 4 3 Unpacking 1 Place the package on the floor without turning it around 2 Take the uppercover off 3 Remove the styrofoam and grasp the p...

Страница 10: ...om ar Installation Manual Page 10of23 4 Turn the platform around and place it where the sanitizer will be installed 5 Take the ceiling out of the box 6 Unscrew the cover open it and take the 4 railing...

Страница 11: ...Sanitizing tunnel ESV700 www dcm com ar Installation Manual Page 11of23 8 Remove the sidewalls from the box 9 Discard packaging...

Страница 12: ...Sanitizing tunnel ESV700 www dcm com ar Installation Manual Page 12of23 NOTA You will find each item in its position For each step you will have to unscrew it put thepart and screw it back...

Страница 13: ...Sanitizing tunnel ESV700 www dcm com ar Installation Manual Page 13of23 4 4 Assembly 1 Open the full sidewall s doors 2 Unscrew the nuts 3 Remove the raills...

Страница 14: ...nel ESV700 www dcm com ar Installation Manual Page 14of23 4 Pick up the 4 railings and attach the monthesidewalls as shown in the images 5 Join the sidewalls to the platform as shown in the illustrati...

Страница 15: ...700 www dcm com ar Installation Manual Page 15of23 6 Put the top frame in position open the doors of both side walls and screw 7 After placing the top frame connect the 4 hoses of the sidewalls to the...

Страница 16: ...Sanitizing tunnel ESV700 www dcm com ar Installation Manual Page 16of23 8 Place each rail in its correct position as shown in the images matching the holes painted in red...

Страница 17: ...700 www dcm com ar Installation Manual Page 17of23 9 Open the sidewalls doors and screw from the inside 10 For screwing tank sside rail move the tank by cutting the seal After fixing the rail put the...

Страница 18: ...r greater electrical safety of the installation it is necessary to comply with the following Power to equipmentmust come from an electrical board not provided The electric panel must be equipped with...

Страница 19: ...dcm com ar Installation Manual Page 19of23 2 Connect the electric supply to the terminal block as shown in the illustration 6 Start up 6 1 Filling the tank Fill the tank directly through the filter p...

Страница 20: ...unnel ESV700 www dcm com ar Installation Manual Page 20of23 6 2 Purge Connect the unit to the power source with 12vDC Hold down the manual button do not release until liquid comes from each of the 4 s...

Страница 21: ...ing tunnel ESV700 www dcm com ar Installation Manual Page 21of23 6 3 Pressure valve In case of willing to correct the pressure you can change it through the pressure valve as shown in the pressure val...

Страница 22: ...e 7 1 Spray nozzle cleaning 1 Pull out the nozzle from the product while holding down the blue part 2 Disassemble the nozzle very carefully as it has tiny components inside 3 Clean all the components...

Страница 23: ...00 www dcm com ar Installation Manual Page 23of23 7 2 Desagote plataforma Do not obstruct the water output Juan de Garay 3942 1636 Olivos Buenos Aires Rep blica Argentina Tel 54 11 4005 5881 4711 0458...

Отзывы: