background image

4

5

Fig 1

MJ/PD Meter Installation

Ÿ

When  replacing  an  existing  water  meter,  loosen  meter  couplings  and 
remove the meter and the old gaskets in the coupling nuts. 

Ÿ

Clean the coupling nuts, removing any dirt from the threads. 

Ÿ

Verify the existing setting for proper alignment and spacing. Correct any 
misalignment and spacing in the setting. 

Ÿ

Place the connection gaskets inside the connection coupling nuts. Use 
rubber gasket hardness of 80-90 Shore A. 

Ÿ

Set the meter between the coupling nuts, properly positioned so that the 
flow indication/arrow on the meter housing points in the direction of flow. 

Ÿ

Start the coupling nuts at the threaded meter ends. Verify that the coupling 
nuts are properly aligned to avoid cross threading damage (stripping) to 
the  meter  ends.  This  is  especially  important  for  the  engineered 
composite/polymer meter. 

Ÿ

The best method for properly starting meter coupling nuts is to position the 
nuts squarely against the meter end. Turn the nut counterclockwise (in 
reverse)  while  holding  the  nut  against  the  meter  end.  When  the  first 
threads on both the coupling nut and the meter spud end coincide, a 
slight click will be heard and the movement of the nut into the starting 
position will be felt. At this point, turn the nut clockwise to complete the 
connection.

Ÿ

In a good installation, this can be accomplished by turning the nut by 
hand until it is tight. When firmly hand tight, apply an additional ¼ to ½ 
turn using an open-end wrench with a short handle. 

WARNING

DO NOT over tighten. 

Coupling Gasket

Coupling Nut

Meter

Tail Piece

PD/MJ Water Meter

Содержание MJ

Страница 1: ...WATER METERS Installation Operating Manual MJ PD WP...

Страница 2: ...SPECIFICATIONS 1 1 2 SYMBOLS WARNINGS 3 INDEX Davis Shirtliff Ltd 2020 Contents herein are not warranted 3 INSTALLATION 4 4 OPERATION MAINTENANCE 7 5 TERMS OF WARRANTY 9...

Страница 3: ...r DN15 and DN20 sizes and brass for larger sizes Meters are supplied with inlet strainers and union connectors PD Rotary piston type meters that provide high accuracy over a wide flow range The mechan...

Страница 4: ...9999 999999 40 0 2 1 15 1 5 3 15 10 40 0 2 1 20 2 5 6 10 3 5 5 12 20 7 50 120 200 70 16 16 16 16 40 40 40 40 0 25 0 24 0 2 0 25 1 1 0 9 1 1 20 2 5 5 25 16 40 0 25 1 50 15 30 7 5 16 50 2 0 02 0 08 65 2...

Страница 5: ...lic CAUTION Instructions should be carried out by a qualified professional with parts equipment approved by the local codes and regulations WARNING Meter must not be used as a lever or crowbar to stra...

Страница 6: ...otective packaging to the point of installation Storage temperatures shall remain within the range of 20 C to 60 C avoiding direct sunlight Special fittings and accessories are available to provide ea...

Страница 7: ...e properly aligned to avoid cross threading damage stripping to the meter ends This is especially important for the engineered composite polymer meter The best method for properly starting meter coupl...

Страница 8: ...lowly to pressurize the downstream consumer side of the system Turn off the consumer faucet when normal water flow occurs Ensuring that all consumer faucets are shut observe the low flow detector in t...

Страница 9: ...ance as shown in Fig 2 Volumetric meters may also be installed vertically or at an incline Ensure that the installed meter will be easily accessible for reading inspection and service Protect the mete...

Страница 10: ...16 bar If there is a pressure regulator verify that the regulator works and is adjusted correctly The service pipe entering and exiting the meter box should be properly bedded to ensure that it is no...

Страница 11: ...bility In lieu of any warranty condition or liability implied by law the liability of Dayliff in respect of any defect or failure of equipment supplied is limited to making good by replacement or repa...

Страница 12: ...INS450A 02 20 www davisandshirtliff com...

Отзывы: