 Electric connection must not be done before LCD control pannel is connected. 

 

The  cable  supplied  with  products  has  boiler  connection  socket  on  one  end  and 

numbered cables for LCD control pannel connection on other end. Boiler connection 

socket is fixed to it’s place on the boiler and fasten by tightening connection part. 

 

For  LCD  control  pannel  connection,  numbered  cables  must  be  fixed  to  their 

numbered place back side of LCD pannel. For seperating thermostad cover and LCD 

4.7. LCD Control Pannel Connection

 

Содержание THERMOCAR 16B

Страница 1: ...1...

Страница 2: ...e reference The installation of the product must be made suitably by authorised person according to rules determined inside the mannual Product must be installed to ventilated place Check if product c...

Страница 3: ...3 2 BOILER CONFIGURATION...

Страница 4: ...Length mm 132 155 Air Channel Discharge Gas Pipe Diameter mm 42 25 Net Weight Without Water Kg 18 2 Gross Weight Without Water Kg 19 2 Insulation Type RUBBER SPONGE Insulation Thickness mm 19 Outer C...

Страница 5: ...mable and explosive substances must not be at the same place with product Make sure that the floor which product will be installed should be strong as to carry the weight of the water filled product D...

Страница 6: ...Definetely teflon must not be used for connections After gas connections are done leakage of connections must be controlled with soap bubble at regular intervals Because of condensing water will be d...

Страница 7: ...d numbered cables for LCD control pannel connection on other end Boiler connection socket is fixed to it s place on the boiler and fasten by tightening connection part For LCD control pannel connectio...

Страница 8: ...se damage to devices While electric connection is made and terminals must be connect correctly Cable sections must be sufficient for maximum electric power of the product For the electric connection o...

Страница 9: ...iler must be discharged Our company will not be responsible from damages and accidents in case of causes from incorrect connection Follow the following points for opreation of the product Install prod...

Страница 10: ...period hour Weekdays 2 time period temperature Weekdays 3 time period minute Weekdays 3 time period hour Weekdays 3 time period temperature Weekdays 4 time period minute Weekdays 4 time period hour W...

Страница 11: ...ot functioned For the deactivated of child lock it is needed to press to and buttons 5 sec The smart phone must be connected to Wi Fi network for downloading It is posisble to control the product by d...

Страница 12: ...It is passed to another step by pressing Confirm the indicator is blinking rapidly button in application after Wi Fi on the LCD pannel starts to blink Device adding process is sterted by pressing Bli...

Страница 13: ...CD pannel and more than this can be made from there LCD pannel must be connected to Wi Fi network for controlling by smart phone For controling of LCD Pannel from smart phone LCD pannel must be connec...

Страница 14: ...t possible gas leakage and when the gas smell is felt shut the gas valves off urgently ventilate the environment by opening the door and the windows Never make a phone call inside the room do not turn...

Страница 15: ...ase of failure of product do not panic and stop using the product Cut Off the gas electricity and water Consult the service department Never leave product electric supply and gas ON position when you...

Страница 16: ...magnesium anode rods lose mass The magnesium anode rod which has completely lost its mass also loses its protection feature The life of the magnesium anode rod depends on the chemical structure of th...

Страница 17: ...lve completely Abnormal pressure Call authorised services Insufficient fresh air Make product pipe controlled Windy weather Do not use it until the wind passes Heatexchanger Block Call authorised serv...

Отзывы: