2
3
Assembly
Important Note: Read the full set of instructions before beginning assembly.
You will be required to provide the following:
•
Connection to the untreated water source
•
120 V electrical outlet for the pump and the solenoid valve
•
Connection to the distribution line
•
Connection to a drain or sump for drainage and overflow lines (optional drainage
packages are available)
Locate System Components
•
Ensure you have all the required parts and materials for assembling the system
(figure 3-1).
•
Arrange the components for ease of installation and maintenance. Consider the
location of the untreated water inlet, floor drain or drainage pipe and electrical outlet.
•
Place the filter on the stand, place the storage tank, pump and pressure tank.
Note
: A qualified plumber should make the connection from the untreated water inlet to
the filter system and the filtered water outlet to the distribution line. Your pump and your
solenoid valve may need to have electrical plugs attached to them. This work should be
performed by a qualified electrician.
•
Install a system bypass in case there is ever a need to take the system off line.
Table 1- Flow Rates and Dimensions
Model No. Flow Rate (nominal)
Filter Dimensions
Storage Tank
L/m
gpm
Diameter (cm) Height
(cm)
Capacity
(gallons)
Dimensions
(cm) LWH
Top
Bottom
SA 60
1
0.25
49
29
94
200
150 x 70 x 90
SA 120
2
0.5
64
42
94
200
150 x 70 x 90
SA 240
4
1.0
78
58
94
200
150 x 70 x 90