
F3234 REV B
May 3, 2019
7
SHOP PRO FXP 95
UPGRADE KIT (UNREGULATED)
DAVCO Technology, LLC
www.davco.com
800-328-2611
1600 Woodland Drive, Saline, MI 48176-1629
33. Bundle the power cord back into the electrical
cavity and replace the access panel.
34. Rotate the motor on pivot so the electrical cord is
down towards the motor mounting plate and tight-
en the motor clamp bolts.
35. Align pump/motor and the confirm pump rotation -
attach the tubes to the suction and the dispensing
hoses and place them in a bucket of fuel.
36. Open both valves as shown.
37. Connect an extension cord to the power box on
the back of the cart.
38. Align the motor/pump – carefully turn the power
switch on and note the sound and appearance
of the motor/pump coupler. The sound should be
smooth and coupler should spin concentric.
39. Tighten the two pump bracket bolts up to finalize
the alignment then shut off the power switch.