background image

user’s manual 

 

14 

1/2cylinder 3/4 antiknock valve 5 check valve 

6 overflow valve 7 

manual rotate valve

 8 throttle valve 

9 pump 10 motor 11 filter 12 oil tank

 

 

Chapter 7 Appendix

 

7.1 HYDRALIC SYSTEM 

-When  pressed  “UP”  button  to  start  the  motor,  to 
pump  oil  from  oil  tank  to  cylinder,  and  to  push  the 
cylinder piston to move. Overflow valve is closed and 
the  pressure  is  been  set  before  packing  in  factory,  to 
ensure the maximum loading of lift. When the system 
pressure  is  over  max  pressure,  overflow  valve  will 
work to have the oil back to oil tank. 

 

-Release  “UP”  button,  motor  stops  to  wok  and 
carriages stop lifting. 
-Press 

“DOWN” 

button, 

to 

connect 

the 

electromagnetic  steel  and  open  the  safety  rack,  pump 
begins  to  have  oil  back  to  oil  tank  and  the  carriage 
begins to lower.   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Picture 11 (hydraulic schematic drawing) 

Содержание LJCC2040A

Страница 1: ...user s manual 1 TWO POST LIFT LJCC2040A U Us se er r s s m ma an nu ua al l Manufacturer ...

Страница 2: ...user s manual 2 MANUFACTURE AND SERVICE AGENT TWO POST LIFT Model Serial no Manufacture date Manufacture Name Address Telephone Fax http E mail AUTHORIZED SERVICE CENTRE ...

Страница 3: ...cy request on nameplate only professional electrician is allowed to connect the power Forbid to load vehicle over 4000KG Read the warning content in user s manual carefully We do not take responsibility to the damage due to improper use or operation Manufacturer owns the right to make little changes for the manual owing to the improvement of technology CATALOGUE Catalogue 1 Packing 2 Description o...

Страница 4: ...any and Japan 2 3 MAIN FABRIC PRINCIPLE Lifting fabric Each post has one cylinder when pump the oil into the cylinder the cylinder pole will move upwards to hold the carriage move upwards Support fabric After driving the vehicle into the working area adjust the angle of arms and length of extension arms to ensure the arms support on the effective vehicle bearing point Fix the position of vehicle b...

Страница 5: ...user s manual 5 Chapter 2 Description of machine 2 4 CONFIGURATION DRAWING Picture 1 dimension drawing ...

Страница 6: ...user s manual 6 Chapter 2 Description of machine Picture 2 arm extension drawing ...

Страница 7: ...ht 98 160mm Lifting time 50S Lowering time 60S Pass width 2390mm Overall width 3440mm Overall weight 870 kg Voltage AC 400V or 230V 5 50Hz Machine power 2 2 KW Hydraulic oil 13L 20 high abrasive hydraulic oil prepared by user Working temperature 5 40 Working humidity 30 95 Noisy level 76db Installation height Height above sea level 1000M Storage temperature 25 55 Installation place Indoor ...

Страница 8: ...arming device water faucet air humidifier and ingle Power supply Before installation get ready for the power supply 3 2 INSTALLATION PROCESS 3 2 1 GENERAL ORIENTATION Lift can only be installed on concrete with steel to reinforce Thickness of concrete 200mm to ensure the intensity reach to 3000PSI 2 1Kg mm2 upwards Height of indoor should be over 4000 mm regard to hold enough space for all lifting...

Страница 9: ...2 Check and ensure the posts dimension is in accordance with picture 5 Test the vertical of post with spirit level construction using type 3 2 5 ORIENTATION OF CROSSBEAM 1 Fix the crossbeam according to the drawing That side with limit switch should be installed on the post with hydraulic unit then fasten with screw 2 Fasten the expansion bolt Notice Select suitable steel shim as gasket and insert...

Страница 10: ...ding to unlocking device 1 and 2 and tighten the cable with cable clip See picture 8 and picture 9 Important notice Correct standard of unlocking adjustment is as follow When nut of electromagnetic steel core is at the end see picture 9 two safety boards strike close to the carriage to lock the carriage effective When the nut of electromagnetic steel core is at the root of thread two safety boards...

Страница 11: ...ect the wires according to electrical diagram and air loop according to air loop diagram Only authorized qualified personnel can install the electrical part Open the control box cover first Power connection Connect the 3 phase five wires 3 2 5mm2 2 1 5 mm2 for the power supply to the terminal of control box according to the circuit diagram If for 230V connection connect to the control box accordin...

Страница 12: ... synchronized If not adjust the cable nut 4 4 LOADING TEST To check whether hydraulic system works normally when loading heavy weight Notice Check every oil pipe and fitting to ensure no leakage before operating the lift Use all the arms when lifting vehicle on the recommended point of the chassis Vehicles barycenter must be in the middle of two support arm Remove or install any heavy part one sho...

Страница 13: ...light load is normal but no lifting with heavy load The set safe pressure of the over flow valve may be increased by turning the set knob right ward slightly The spool of the lowering solenoid valve is stuck by dirt Clean the spool the amount of hydraulic oil is not enough Add hydraulic oil When lifting operation the motor runs but it is no lifting movement the descend valve is not closed fastened...

Страница 14: ...nder piston to move Overflow valve is closed and the pressure is been set before packing in factory to ensure the maximum loading of lift When the system pressure is over max pressure overflow valve will work to have the oil back to oil tank Release UP button motor stops to wok and carriages stop lifting Press DOWN button to connect the electromagnetic steel and open the safety rack pump begins to...

Страница 15: ...user s manual 15 7 2 EXPLODED DRAWING OF MAICHINE ...

Страница 16: ...user s manual 16 Circuit diagram 220V ...

Страница 17: ...user s manual 17 Circuit diagram 380V ...

Отзывы: