
PQRM5300 33 Ux Ix xx xx (PS)
46
20201120-V1
7.3.1.3. Phase lag of CT settings
Function
If you know the phase shift (50Hz) of the current
transformer, you can specify the value here. The device to
compensate the measurement results.
[Default: 0.]
Sequence of operations
1. Log in the 7. Configurations menu
2. Choose the 7.1. Measure settings menu of the
7. Configurations menu with
/
buttons, and press
the ENTE switch.
3. Choose the 7.1.3. CT phase shift menu of the
7.1 Measure settings menu with
/
buttons, and
press the ENTE switch
4. Select the I1 Phase shift menu with
switch, and then
Press the EDIT switch.
5. Please type the phase value with help
, - , +
switches, and press the OK switch to accept the value.
6. Repeat please the 4. step and 5. step with other currents
transformers.
7. Press the OK switch to save and to exit from 7.1.3. CT
phase shift submenu