16
Jumper Link “J7”
Connecting x4 links
Frame Locking
When using the Datapath Optical Expansion Link it is not possible to maintain display frame locking. It is
assumed that displays controlled from the expansion chassis would be sufficiently far away from the host
machine that this will not be a problem. It should be noted that all displays within an expansion chassis (or
cluster of chassis) connected using a standard HLink-G3 and ExCable-G3 will remain frame-locked to each
other.