Datapath Express9 Скачать руководство пользователя страница 13

 

                                                                        13                                                        
09/03/2011 

 

Datapath Limited 

Datapath has a long and very successful history in the computer graphics industry.  Datapath 
has been designing and supplying high performance, high quality graphics display systems to 
the worlds largest and most demanding companies and institutions since 1982.  Datapath 
was one of the founding companies of multi-screen Windows acceleration using single and 
multi board solutions.  Now using the very latest display technology Datapath offers some of 
the world’s leading multi screen graphics accelerators for the most demanding applications. 

As new technology advances, so we at Datapath improve the performance and functionality 
of both our hardware and software to give our customers more.   Following a continuous 
development program, we pride ourselves on our support and responsive nature towards all 
our customers and their changing needs.  As more sophisticated equipment and techniques 
become readily available, so we are there to exploit the power and potential that this 
technology presents. 

Technical Support 

Registered Users can access our technical support line using, email, and the Support page 
on the Datapath Web Site, usually with a response within 24 hours (excluding weekends). 

Via Email 

Send an email to 

[email protected]

 with as much information about your system as 

possible.  To enable a swift response we need to know the following details: 

 

Specification of the PC - including processor speed 

 

Operating System 

 

Application Software 

 

Datapath Hardware / Software 

 

The exact nature of the problem - and please be as specific as possible. 

Please quote version and revision numbers of hardware and software in use wherever 
possible. 

Copyright Statement 

© Datapath Ltd., England, 2009 

Datapath Limited claims copyright on this documentation.  No part of this documentation may 
be reproduced, released, disclosed, stored in any electronic format, or used in whole or in 
part for any purpose other than stated herein without the express permission of Datapath 
Limited. 

Whilst every effort is made to ensure that the information contained in this on-line help is 
correct, Datapath Limited make no representations or warranties with respect to the contents 
thereof, and do not accept liability for any errors or omissions.  Datapath reserves the right to 
change specification without prior notice and cannot assume responsibility for the use made 
of the information supplied.  Datapath Limited acknowledges all registered trademarks used 
within this documentation. 

Содержание Express9

Страница 1: ...1 09 03 2011 Express9 User Manual UK Headquarters Datapath Ltd Alfreton Road Derby DE21 4AD UK Tel 44 0 1332 294441 Fax 44 0 1332 290667 Email sales datapath co uk www datapath co uk ...

Страница 2: ...Installing the Express9 Backplane 6 Installing an SBC 7 Express9 slot layout 7 Connecting a Host Machine to an Expansion Chassis 8 Connecting more than one Chassis 9 Gen locking Cables on H Link and S Link Boards 9 Express9 LED s 12 Datapath Limited 13 Technical Support 13 Copyright Statement 13 Index 15 ...

Страница 3: ...3 interface USB Ports 2 x ports via PICMG1 3 interface S Link Max Power 5W Power requirements Max current at 3 3V 0 1A Max current at 12V 0 3A Max current at 5V 0 1A Form Factor PICMG1 3 PCIe x 8 expansion interface H Link Max Power 5W Power requirements Max current at 3 3V 0 1A Max current at 12V 0 3A Form Factor PCIe x 8 Environment Express9 Slink Hlink Ex cable Operating Temperature 0 to 35 deg...

Страница 4: ...n system for a standard PC Features Nine slot PCIe backplane 8 x 4 lane slots plus 1 x 8 lane slot All slots implemented as x 16 physical connectors so any width PCIe card can be accommodated 1 x PICMG 1 3 SBC slot Use as a PCIe expansion backplane for a standard PC using the S Link and H Link cards Compatible with a standard 4U IPC chassis Support for daisy chaining multiple backplanes PCIe Switc...

Страница 5: ...th CD containing the user manual Note All PCB s are static sensitive and are packed it anti static materials Please keep the Express9 Backplane and any plug in card in its packaging until you are ready to install and observe anti static precautions when installing this product Requirements To install the Express9 backplane you require ATX Power supply Chassis Host Computer ...

Страница 6: ...f locating mounts not used by the Express9 it is important that stand off mounts are used to ensure the reverse side of the backplane does not come into contact with any unused mounts Once the Express9 is secured inside the chassis connect the power supply to one of the four connectors J1 J2 J3 and J4 on the Express9 backplane and connect the 12v supply J5 or J6 Connect the fan headers There is no...

Страница 7: ... PICMG1 3 SBC slot The SBC should be installed as per the manufacturer s instructions Express9 slot layout Please note Datapath recommend that the first x8 PCIe slot is not occupied with a graphics card as this can cause BIOS issues with certain chipsets This slot should be reserved as the expansion slot or for a non VGA device ...

Страница 8: ...the diagram above The S Link card should occupy the first half of the PICMG1 3 slot connectors A and B Connect the H Link and S Link cards using the Ex cable When powering up the host machine the expansion chassis will power up automatically the LED for the PICMG1 3 slot containing the S Link card will flash indicating that a successful link has been made between the host machine and the expansion...

Страница 9: ... This is useful when using multiple chassis that each contains a number of Datapath Image4 graphics cards The gen locking chain can be used to tie the outputs of the graphics cards together so that they all render their outputs to the screen at the same time This makes fast moving images appear smoother on the video data wall and eliminates tearing artefacts on the display To create a gen locked c...

Страница 10: ... of the S Link board in the downstream expansion chassis back into the next Image 4 graphics card in the chain as per the following image Note again that the cable supplied with the S Link board is longer than those supplied with the Image4 graphics card in order to cover the extra distance ...

Страница 11: ...slot of the first expansion chassis and by connecting a Gen lock cable from the S Link board directly into the H Link card in the expansion chassis whilst at the same time connecting the H Link output to the next Image 4 graphics card See the following picture as an example In this way you can create very large systems and maintain the gen locking capability between all Image 4 graphics cards ...

Страница 12: ...hat the full lane width has been established for that slot e g x4 card in a x4 slot Flashes on for 0 5 seconds then off for 1 5 seconds This indicates that a reduced lane width has been established and the slot is not working to maximum efficiency e g a x1 card inserted into a x4 slot No LED s flashing This indicates that lane width has not been established The LED s will not flash on slots where ...

Страница 13: ... Datapath Web Site usually with a response within 24 hours excluding weekends Via Email Send an email to support datapath co uk with as much information about your system as possible To enable a swift response we need to know the following details Specification of the PC including processor speed Operating System Application Software Datapath Hardware Software The exact nature of the problem and p...

Страница 14: ... Ltd Alfreton Road Derby DE21 4AD UK Tel 44 0 1332 294441 Fax 44 0 1332 290667 Email sales datapath co uk www datapath co uk French Office Datapath France 7 rue des Pinsons 78990 Elancourt Tel 33 1 30 13 89 34 Fax 33 1 30 13 89 35 Email datapathfrance sqynet com ...

Страница 15: ...nch Office 14 H Link 8 increasing the number of PCIe slots 9 Installing Vision Switch with Multiple iH4 Cards 7 Introduction 5 LED 12 locating mounts 6 Max Power 3 packing box 5 Power requirements 3 Relative Humidity 3 Requirements 5 SBC 7 S Link 3 9 slot layout 7 Specifications 3 stand off mounts 6 Storage Temperature 3 Switch Fabric 4 Technical Support 13 Unpacking 5 ...

Отзывы: