
Hardware Operations
To ensure proper cooling. Chassis cover must be install before turning on the system.
2.3
Power Supplies
CiB-9224 V12 offer two 1200w hot-swappable redundant power supplies. If one power supply
fail, simply replace the power supply module without powering off the system.
The location of power supplies on the server is shown below:
Figure 2-4 Power Supply Locations
Reminder
Please follow the steps below before removing or installing the power supply modules.
Step 1:
Disconnect all necessary cables.
2.3.1
To remove the power supply
Pull up the handle.
Press the retaining clip on the right side of the power supply along the direction of the
arrow.
At the same time, pull out the power supply. (The power supply takes considerable force to
remove.)
2-3
CiB-9224 V12
Содержание CiB-9224 V12
Страница 1: ...CiB 9224 V12 Tech Manual DataON Storage storage division of Area Data Systems Version Jun 2015...
Страница 3: ......
Страница 5: ......
Страница 7: ......
Страница 26: ...1 5 5 Motherboard Connectors Figure 1 6 Motherboard Overview CiB 9224 V12 1 8...
Страница 43: ...Type here Appendix China RoHS Regulations...
Страница 44: ...Hardware Operations Appendix Appendix China RoHS Regulations Figure I China RoHS Regulations CiB 9224 V12 I...