2-10
Magellan
®
8500
Scanner
Checkstand Preparation
Reference Figure 2-5. When performing a first time installation into a
new checkstand, verify before cutting that room will be allowed for
cabling and the AC/DC Power Supply. When making the opening, take
extra care to accurately cut to the correct dimensions. Mounting may
require installation of support(s), countertop routing, or other such
devices. Depending upon checkstand design, you may wish to install an
item diverter to direct items toward the scan window. See the instructions
in this manual titled “Counter Cutout” for more details concerning the
location and preparation of the opening.
Figure 2-5. Installation Overview
Item
Diverter
Routed
Support
Lip
Counter Cutout
Support Rails
Cabling
AC/DC
Power
Supply
Содержание MAGELLAN 8500 Omega
Страница 1: ...Magellan 8500 8500 Product Reference Guide...
Страница 14: ...12 Magellan 8500 Scanner...
Страница 60: ...2 32 Magellan 8500 Scanner Figure 2 19 Using the Lift Handles Lift Handles...
Страница 62: ...2 34 Magellan 8500 Scanner NOTES...
Страница 81: ...Product Reference Guide 4 5 Figure 4 1 7 Segment LED Display 7 Segment Display...
Страница 98: ...5 10 Magellan 8500 Scanner Figure 5 3 Shift Test A C B D A C B D...
Страница 106: ...5 18 Magellan 8500 Scanner NOTES...
Страница 378: ...6 272 Magellan 8500 Scanner NOTES...
Страница 392: ...B 8 Magellan 8500 Scanner NOTES...
Страница 402: ...D 2 Magellan 8500 Scanner NOTES...
Страница 416: ...E 14 Magellan 8500 Scanner NOTES...
Страница 432: ...F 16 Magellan 8500 Scanner NOTES...
Страница 433: ...Product Reference Guide F 17 NOTES...
Страница 434: ...F 18 Magellan 8500 Scanner NOTES...